The City of Palmdale is seeking a contractor for buffered bike lanes and related roadway and traffic-detection improvements on Avenue S.
- **Government buyer:** City of Palmdale, Department of Public Works, Capital Improvement Program; Finance is listed as the agency department.
- **Project:** Avenue S Bike Lane Improvements, Project No. 927, along about 0.5 miles between 10th Street East and Casa Verde Drive.
- **Work requested:** Build Class II buffered bike lanes; remove and restripe the raised median and two-way left-turn lane in a shifted alignment; install video detection at an existing signalized intersection; and perform associated pavement, curb, concrete, irrigation, signing, and striping work.
- **Bid-schedule quantities:** 72 cubic yards of excavation; 25 tons of 8-inch full-depth asphalt concrete pavement; 197 linear feet of A1-6 median curb; and 1,730 square feet of 4-inch stamped concrete. Other bid items are lump sum.
- **OEMs:** No manufacturer or OEM is specified for the video detection system or other work.
- **Companies named in the notice:** All American Asphalt; ANM Construction & Engineering; CA Traffic Solution; Cannon; Elecnor Belco Electric, Inc.; GovGuide; GSA Contract Services, LLC; KASA Construction, Inc.; Marina Landscape Inc.; R.C. Becker and Son, Inc.; and Taft Electric Company.
- **Notable requirements:** Removed City irrigation infrastructure must be returned to the City. The contractor must hold a valid California Class A contractor’s license; the successful contractor must also have a current City business license. The documents indicate a 60-working-day construction duration, while a traffic engineering provision states 60 calendar days.

### Description

The City of Palmdale is seeking bids for construction of approximately 0.5 miles of bike lane striping along Avenue S, from 10th Street East to Casa Verde Drive. The work primarily involves Class II buffered bike lanes and removal and restriping of the existing raised median and two-way left-turn lane, shifted slightly south. The project also includes installing video detection cameras at the existing signalized intersection and has a duration of 60 working days. Bids are to be submitted electronically through PlanetBids.