# North Orange County Regional Occupational Program Opengov #Project Industry Day - BHS

Informational outreach for John Wayne Airport terminal baggage-handling improvements

**Posted:** November 24, 2026
**Respond By:** December 08, 2026
**Identifier:** Project Industry Day - BHS
**NAICS:** 236220

Orange County’s John Wayne Airport is holding an informational outreach meeting and site walk for planned baggage-system improvements in Terminals A, B, and C.
- **Opportunity type:** Voluntary pre-solicitation industry outreach for an anticipated progressive design-build project; this is not a request for proposals or qualifications.
  - Participation is not required to compete in a future procurement and will not affect evaluation.
  - The notice gives conflicting meeting-year information: December 8, 2027 in the event description and December 8, 2026 as the portal response deadline.
- **Planned work:** Modernize inbound and outbound baggage systems, including conveyors, controls, mechanical equipment, and related infrastructure.
  - Replace aging equipment in Terminals A and B and add automated bag-drop capability.
  - Update Terminal C controls, conveyor layouts and merges, ticket counters, and screening access.
  - Create a consolidated Terminal B Checked Baggage Inspection System (CBIS) with **four EDS machines**, oversized-baggage screening, added queue capacity, automated bag tracking, and improved TSA workflows.
  - Upgrade operating systems, servers, cybersecurity, electrical and mechanical infrastructure, and motor control centers; improve maintenance access and safety.
- **Delivery and value:** Progressive design-build; anticipated guaranteed maximum price (GMP) range is **$200 million to $231 million**.
- **Schedule:** Tentative notice to proceed is July 2027, with phased design, permitting, fabrication, and construction extending through January 2033. Work is planned to minimize disruption to airport operations.
- **Attendance requirements:** Site-walk participants must RSVP in advance and follow airport identification, security, safety, and escort requirements.
- **OEMs:** No manufacturers or vendors are identified in the notice.

### Description

The County of Orange, through John Wayne Airport, is holding a non-mandatory pre-solicitation outreach meeting and site walk for the anticipated Progressive Design-Build Terminal A, B and C Baggage Handling System Improvements - Phase 3 project. Planned improvements include modernizing baggage-handling systems and controls in all three terminals, replacing aging equipment in Terminals A and B, and consolidating screening in a Terminal B Checked Baggage Inspection System facility. The event is informational, participation is voluntary, and attendance is not a prerequisite for responding to the forthcoming RFQ; the anticipated RFQ issuance is Q1 2027. The current expected GMP range is $200,000,000–$231,000,000.

[View original listing](https://procurement.opengov.com/portal/ocgov/projects/329038)