# E-Rate #270004936

KIPP TEAM and Family Schools network equipment, installation, licensing, and support procurement

**Posted:** November 24, 2026
**Respond By:** December 22, 2026
**Identifier:** 270004936
**NAICS:** 423430, 541519, 541512

KIPP TEAM and Family Schools is seeking bids for a multi-site network upgrade and support package for its school consortium.
- **Government buyer:** KIPP TEAM and Family, E-Rate Department; the opportunity serves consortium campuses in New Jersey and includes a new Paterson site and a Miami campus.
- **OEMs named:** **Cisco Systems** (including Meraki products), **Palo Alto**, **American Power Conversion (APC)**, and **Juniper**. Equivalent products may be proposed where allowed.
- **Requested equipment:** Firewalls, SD-WAN appliances, switches, wireless access points, UPS units, antennas and related components, patch cables, licenses, and accessories. The initial notice identifies 4 firewalls, 39 and 126 switches, 1 router, 96 and 1,076 access points, 16 UPS units, and 185 antennas/connectors/components; quantities in detailed site requirements and the support inventory are listed separately below.
- **Notable equipment specifications:** Palo Alto PA-1410 firewalls require capacity for at least 50 concurrent remote-access seats; the new-site requirement includes a Palo Alto ION 3200 or equivalent SD-WAN appliance. Switches must meet site-specific PoE-port and fiber-uplink needs, including 10 GbE; wireless access points must support 802.11ax and 6 GHz capability where specified. High-capacity access points must support more than 100 concurrent connections. UPS units require remote management and SNMP alerts, with at least 10 minutes of backup power.
- **Services and support:** Installation, configuration, testing, commissioning, and handover; site-specific AP mounting and removal; remote-access and SD-WAN configuration; and maintenance support. Cisco Smart Net and Meraki license renewal pricing is requested for existing and new equipment, with 3- and 5-year term options. Meraki switch renewals must include a 4-hour hardware-replacement upgrade when not otherwise included.
- **Term requirements:** Installation is planned for the summer 2027 window. Maintenance coverage is requested for three years; Cisco and Meraki renewals are priced for 3- and 5-year terms. Equipment licenses and subscriptions generally may not exceed three years, while AP licenses are preferred for five years.
- **Scope limits:** Cabling projects and managed internal broadband services are excluded. Vendors must identify and separate E-Rate-ineligible products and services.

### Description

KIPP TEAM and Family Schools is seeking bids for networking equipment, including firewalls, switches, routers, wireless access points, UPS devices, and related components and licensing. The work includes purchasing, installation, and configuration, along with Smart Net renewal pricing for existing and new equipment for three- and five-year terms. The Form 470 lists equipment quantities and requests eligible and ineligible products and services to be clearly separated. The RFP states that proposals are due by December 22, 2026, at 5:00 p.m. EST.

[View original listing](https://publicdata.usac.org/EPC/Prd/Form470/270004936/16079878/22977619-USAC_FCC_FORM_470_APPLICATION_270004936_CERTIFIED.pdf)
