# SAM #EQPMBE-27-0054

Calexico East LPOE Gantry Roof Repair with Tremco AlphaGuard BIO or Equivalent

**Buyer:** PBS PROJECT DELIVERY WEST - BRANCH E
**Posted:** November 24, 2026
**Respond By:** December 10, 2026
**Identifier:** EQPMBE-27-0054
**NAICS:** 236220

GSA is seeking small-business contractors to repair the gantry roof at the Calexico East Land Port of Entry.
- **Government buyer:** General Services Administration (GSA), Public Buildings Service (PBS), Project Delivery Zones 5–7 – Pacific Northwest & Pacific Southwest Branch.
- **Location:** Gantry Building, Calexico East Land Port of Entry, Calexico, California.
- **Named OEM:** **Tremco**; the specified system is Tremco AlphaGuard BIO with Tremco Permafab reinforcement. An approved equivalent is permitted.
- **Requested work:** Prepare and repair the roof, including substrate repairs, flashing details, joint sealing, and priming, then apply the roofing system.
- **Key requirements:** Restore waterproofing and extend roof service life without a costly tear-off; minimize VOC emissions and odors at the occupied federal facility. The system is also intended to improve solar reflectance.
- **Quantities and part numbers:** Not specified.

### Description

<p>In accordance with FAR 5.101(b)(1)(i), this is a 15 day presolicitation notice that GSA will solicit contractors to&nbsp;install new Tremco AlphaGuard system or approved equivalent on the Gantry Building at the Calexico East Land Port of Entry (CA0540WW) in Calexico, CA.&nbsp;The work encompasses surface preparation, substrate repairs, flashing details, joint sealing, priming, and the application of a high-performance, two-component, bio-based polyurethane liquid-applied roof system (Tremco AlphaGuardTM BIO System) reinforced with stitchbonded polyester fabric (Tremco Permafab&reg;). The primary purpose of this project is to restore waterproofing integrity, address seam and detail vulnerabilities, enhance solar reflectance, and extend the service life of the roof system without requiring a costly tear-off, while minimizing VOC emissions and odors during construction in an<br />
occupied federal facility.</p>

[View original listing](https://sam.gov/opp/d7b890d139514f708353b38411a8348a/view)
