# SAM #W912QR279A005

Design-build of a secure U.S. Space Force Integration Facility

**Buyer:** USACE Louisville District
**Posted:** November 24, 2026
**Respond By:** December 24, 2026
**Identifier:** W912QR279A005
**NAICS:** 236220

USACE is seeking a qualified design-build team for a secure U.S. Space Force facility at Wright-Patterson Air Force Base.
- **Government buyer:** U.S. Army Corps of Engineers (USACE), Louisville District.
- **Project:** Design and construction of a new, multi-floor secure facility of approximately 333,700 square feet at Wright-Patterson Air Force Base, Ohio, physically connected to existing Building F/10854.
- **Scope:** Site work and utility integration; high-efficiency HVAC and other mechanical, electrical, and plumbing systems for continuous operations; secure structural, building-envelope, electrical-switchgear, and controlled-space systems; commissioning and accreditation.
- **Specified equipment:** Replace two existing end-of-life backup generators, each rated at 2,000 kW. No generator part numbers are provided.
- **Critical requirement:** Building F/10854 must remain occupied and operational during construction, with no unscheduled interruptions to 24/7 mission operations, utilities, communications, or existing secure-facility accreditation.
- **Design baseline:** The Government will provide concept design information, programmed requirements, and initial planning data. Material deviations require Government review and approval.
- **OEMs and vendors:** None are named.

### Description

USACE Louisville District issues this Request for Qualifications (RFQ) to identify and select the single most highly qualified Design-Build Team to execute the United States Space Force (USSF) Integration Facility (UIF) project at Wright-Patterson Air Force Base (WPAFB), Ohio.The project provides a new, multi-floor, approximately 333,700-square-foot secure USSF Integration Facility and a physical connection to active Building F/10854. The project includes site work; utility distribution integration; high-efficiency HVAC and other MEP systems designed for continuous operations; replacement of two (2) existing end-of-life 2000 kW backup generators; high-security electrical switchgear; a secure structural and envelope system; specialized controlled spaces, commissioning, and accreditation activities.The Government will provide available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate that baseline and may recommend refinements. Any material deviation from the Government baseline requires Government review and approval.Sustained Mission Readiness: Building F/10854 will remain fully occupied and operational throughout construction. The Design-Builder must plan and execute all work to avoid unscheduled interruption of 24/7 mission operations, utilities, communications, and existing secure-facility accreditation. <br/><br/><br/><strong>Additional Links:</strong><br/><a href='https://toolbox-piee.eb.mil/' target='_blank'>Department of Defense Procurement Toolbox</a><br/><a href='https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912QR279A005&noticeType=SolicitationNotice' target='_blank'>PIEE Solicitation Module Link for W912QR279A005</a><br/><a href='https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf' target='_blank'>Registration Instructions for the PIEE Solicitation Module</a><br/><a href='https://piee.eb.mil/wbt/xhtml/wbt/sol/index.xhtml' target='_blank'>Web Based Training for the PIEE Solicitation Module</a>