# Maryland Procurement Portal #BPM059893

Replace two I-95/495 bridges and improve nearby MD 4 ramps and roadways

**Posted:** November 24, 2026
**Respond By:** January 14, 2027
**Identifier:** BPM059893
**NAICS:** 237310

Maryland State Highway Administration is seeking construction bids for bridge replacement and related highway improvements in Prince George’s County, Maryland.
- **Government buyer:** Maryland State Highway Administration.
- **Project location:** I-95/495 (Capital Beltway) over MD 4 (Pennsylvania Avenue), Prince George’s County.
- **Bridge work:** Replace and widen Bridge Nos. 1615905 and 1615906, changing the existing dual four-span steel beam bridges to dual two-span steel girder bridges.
- **Roadway and ramp work:** Widen and resurface 0.97 miles of I-95 and 0.62 miles of MD 4; remove two interchange loop ramps; build two spur ramps; widen two outer entrance ramps; and construct a retaining wall.
- **Other work:** Install traffic barriers, stormwater management facilities, signing, lighting, traffic signals, ITS equipment, permanent pavement striping, and landscape plantings.
- **Key requirement:** Maintain traffic in both directions on I-95/495 and MD 4 through staged construction.
- **OEMs and named vendors:** None identified.

### Description

The project replaces and widens Bridge Nos. 1615905 and 1615906 on I-95/495 over MD 4. Work also includes widening and resurfacing portions of I-95 and MD 4, removing two interchange loop ramps, constructing two spur ramps, widening two outer entrance ramps, and building a retaining wall. Additional work includes traffic barriers, stormwater management, signing, lighting, traffic signals, ITS equipment, pavement striping, and landscaping. Traffic in each direction on I-95/495 and MD 4 will be maintained through staged construction.

[View original listing](https://emma.maryland.gov/page.aspx/en/bpm/process_manage_extranet/96825)
