# Massachusetts COMMBUYS #BD-27-1020-DCRFC-DC366-135648

Massachusetts DCR Hazard Tree Removal and Pruning Services

**Posted:** November 23, 2026
**Respond By:** December 08, 2026
**Identifier:** BD-27-1020-DCRFC-DC366-135648
**NAICS:** 115310, 561730

Massachusetts DCR is seeking tree-removal and pruning services at Harold Parker State Forest and Bradley Palmer State Park.
- **Government buyer:** Commonwealth of Massachusetts, Department of Conservation & Recreation (DCR), DCR Forest Fire Control.
- **Opportunity:** Hazard-tree removal, pruning, and mitigation under FAC 120, Category 3 Tree Services. No specific tree count is provided.
- **OEMs and vendors:** No OEMs, manufacturers, or bidding vendors are named; this is a labor-and-equipment service procurement.
- **Work and requirements:** Remove designated trees and woody material, prune, dispose of material lawfully, clean up sites, and restore contractor-caused damage. Contractor supplies labor, equipment, supervision, permits, and safety and traffic controls.
  - Equipment examples include an aerial bucket truck with at least 65-foot reach, a crane with at least a 140-foot main boom and 26-ton capacity, a commercial-grade chipper, logging trucks, skid steers, chainsaws, stump grinders, and ground-protection mats.
  - The superintendent must hold Massachusetts Certified Arborist or International Society of Arboriculture certification. Crews must be properly licensed, trained, and experienced.
  - Work generally takes place on weekdays during daytime hours. The contractor must coordinate with utilities, check in with DCR daily, and provide a one-year workmanship guarantee.
- **Performance timing:** Work begins within 10 business days after the certified Notice to Proceed. The contractor must return to each site within six months of removal to address cleanup compliance.

### Description

The Department of Conservation and Recreation is seeking vendor(s) to remove and prune hazard trees and perform related mitigation in Harold Parker State Forest and Bradley Palmer State Park. The contractor must provide the labor, materials, equipment, supervision, permits, and services needed to complete the work under the stated specifications and FAC 120 requirements. Work includes safety and traffic controls, coordination with utilities, proper disposal of woody material, and restoration of affected areas. Bids require the completed response form, all-inclusive pricing, subcontractor insurance documentation, and three relevant references; prevailing wage requirements apply.

[View original listing](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-27-1020-DCRFC-DC366-135648&external=true&parentUrl=close)
