# SAM #70ZU0127QPBPL0012

FY2027 Drydock Repairs and Overhaul for USCGC TERN

**Buyer:** CG-SEA-C21
**Posted:** November 24, 2026
**Respond By:** November 24, 2026
**Identifier:** 70ZU0127QPBPL0012
**NAICS:** 336611

The U.S. Coast Guard is seeking a shipyard to complete FY2027 drydock repairs and overhaul work on USCGC TERN (WPB-87343). 
- **Government buyer:** U.S. Department of Homeland Security, U.S. Coast Guard, CG-SEA-C21, Norfolk; contact: Ms. Torrie M. Jones.
- **Opportunity:** Firm-fixed-price drydock repair availability; the schedule identifies one primary availability CLIN (0001). No repair contractor or reseller is named.
- **OEMs and named manufacturers:** **MTU** (main engines), **Thordon** (shaft bearings), and **Wartsila** (rudder seal kit).
- **Scope:** Hull surveys and coating preservation; tank cleaning; MTU 8V396TE94 W-5 maintenance on two main engines; propulsion shaft, bearing, propeller and rudder work; electrical, seawater, ventilation, HVAC and plumbing maintenance; drydock, temporary services and sea-trial support.
- **Facility and performance requirements:** Facility must be accessible by navigable waterway, with at least 12 feet of water depth and 55 feet of clearance; vessel must be able to arrive, remain afloat and depart under its own propulsion at all tides and times. Availability is 63 days, with five laydays listed.
- **Notable work controls:** Perform up to 250 hull UT measurements; provide inspection reports and supporting data; complete designated critical reports within the first 25% of the availability; support Coast Guard inspections and comply with specified coating controls. Open-and-inspect repair pricing includes 544 labor hours and a material markup/handling fee.
- **Government-furnished items:** Numerous parts and equipment are provided or may be provided by the Government, including engine components, shafts, propellers, bearings, valves, rudders, transducers and anodes; certain tools and fixtures are loaned and must be returned.
- **Estimated value:** Approximately $1.5 million–$4 million; the supplied materials do not state a total contract price.

### Description

<p>TERN DD POP 08JUN2027 - 10AUG2027</p>

[View original listing](https://sam.gov/opp/78f643b0fc2542d99114cd62fdf31210/view)
