# CanadaBuys #RF-97-207

Hourly flood-response equipment and labor services for Manitoba dike closures

**Posted:** November 23, 2026
**Respond By:** December 15, 2026
**Identifier:** RF-97-207
**NAICS:** 237990

Manitoba is seeking hourly equipment and labor support for flood-response and dike work near Winnipeg.
- **Buyer:** Manitoba Transportation and Infrastructure, through its Tendering and Contracts office.
- **Scope:** Build and remove clay closures at the permanent Floodway and West Dike; handle borrow material; perform dike repairs, maintenance, cleanup, remediation, and traffic control.
- **Hourly service schedule:**
  - Group 10 hydraulic excavator with twist bucket — 8 hours; Group 9 hydraulic excavator with twist bucket — 8 hours.
  - Group 6 crawler tractor with six-way dozer and rear-mounted ripper — 8 hours; Group 5 crawler tractor with six-way dozer — 8 hours.
  - Group 5 tracked skid-steer loader with bucket, forks, sweeper, and power rake — 4 hours; Group 4 rubber-tire loader with bucket and forks — 4 hours.
  - Group 3 motor grader — 2 hours; Group 3 self-propelled vibratory steel packer, padfoot — 2 hours.
  - Group 3 wheeled farm tractor with disc, harrows, and drill-method seeder — 2 hours; Group 3 wheeled farm tractor — 2 hours.
  - Tandem-axle straight end-dump truck with a minimum 7-cubic-metre box — 32 hours; semi with tandem-trailer end dump — 16 hours.
  - Traffic control flag person — 2 hours; labourer — 2 hours.
- **OEMs and vendors:** No equipment manufacturers or OEMs are specified. MERX is named as the bidding and document platform.
- **Notable requirements:** Work, timing, and quantities depend on flood conditions and are not guaranteed. If closures are not needed, equipment will not be mobilized and no payment will be made. The arrangement covers spring response and may include call-outs for later flood events.

### Description

The tender seeks to establish a binding unit-price contract with the low bidder for spring flood response, and a non-binding call-out list of qualified bidders for possible future summer or fall events. Work mainly involves constructing and removing clay closures at openings of the permanent flood protection Floodway and West Dike from the vicinity of Winnipeg to Brunkild, Manitoba, if required. Contractors may be directed to provide equipment and perform borrow-material handling, dike repair and maintenance, cleanup and remediation, and traffic management. Work quantities, timing, and scale are not guaranteed; if closures are not required, there will be no mobilization or payment.

[View original listing](https://canadabuys.canada.ca/en/tender-opportunities/tender-notice/mx-243100873859)
