# Nevada Ionwave #27300240 Addendum 2; CC-2027-069

Carson City Riverview Trailhead improvements for the Carson River Trail System

**Posted:** November 03, 2026
**Respond By:** December 03, 2026
**Identifier:** 27300240 Addendum 2; CC-2027-069
**NAICS:** 237310, 237990

Carson City is seeking a contractor for Phase IV improvements at the Riverview Trailhead of the Carson River Trail System in Nevada.
- **Government buyer:** City of Carson City, Nevada; the Contracts and Purchasing Administrator is identified in the contract award information.
- **Project scope:** Demolish and replace the parking area while protecting existing monuments; install a prefabricated restroom and shade structure; build concrete picnic areas and walkways; revegetate disturbed areas; and connect improvements to existing trails.
- **OEM:** **CXT** is named as a proposed equivalent for the prefabricated restroom; the provided information does not show whether it was approved.
- **Requirements:** Use existing utilities and prepare and implement a Stormwater Pollution Prevention Plan (SWPPP). The federally funded project is subject to Nevada prevailing wage requirements and Davis-Bacon wage determinations.
- **Related project requirements:** Certified payroll reports are submitted weekly through Carson City’s LCPtracker system by an authorized Payroll Officer. The contract information also requires bonds and insurance; the project must start after the Notice to Proceed and finish within the working days specified in the Special Conditions.
- **Estimated value:** $1,370,409. No individual quantities or part numbers are provided for construction components.

### Description

Carson City is soliciting sealed electronic bids for labor, materials, tools, and equipment for trailhead improvements at the Korean War Veterans Memorial. Work includes demolition and removal of the existing parking area while protecting existing monuments, construction of an upgraded parking area, installation of a prefabricated restroom and shade structure, concrete picnic areas and walkways, revegetation, and connection to existing walking trails. Existing utilities will be used, and the contractor is responsible for preparing and executing the SWPPP. The project is federally funded by SNPLMA, and Nevada prevailing wage rates have been adopted for the stated Davis-Bacon wage determinations.