# Nevada Ionwave #013869 Addendum 1

Water Quality Office Remodel at River Mountain Water Treatment Facility

**Posted:** November 18, 2026
**Respond By:** December 03, 2026
**Identifier:** 013869 Addendum 1
**NAICS:** 236118, 238150

The Southern Nevada Water Authority is seeking bids to remodel its Water Quality Office at the River Mountain Water Treatment Facility in Henderson.
- **Buyer:** Southern Nevada Water Authority; the work is for the Water Quality Office in the Laboratory Building’s south wing.
- **Opportunity:** Invitation for Bid 013869, Addendum 1, covering an office remodel at the River Mountain Water Treatment Facility.
- **Requested work:** Convert a copier room into a wellness room; demolish walls for a central cubicle area; reconfigure two offices into three; convert an office into a small workgroup room; and install large glass windows in the Lab Manager’s office, conference room, and three proposed offices.
- **Finishes and building systems:** Provide paint, carpeting, copy-room cabinetry, frosted nameplates, dimmable lighting, and replacement ceiling frames, tiles, and baseboards. Modify fire sprinkler and alarm systems, reconfigure HVAC, and upgrade electrical, data, and communications systems.
- **Estimated value:** The engineer’s estimate is $345,611; no separate contract value range is stated.
- **OEMs and vendors:** No manufacturers, branded products, product part numbers, or project vendors are identified.
- **Notable requirements:** The project combines interior reconfiguration and finishes with related fire protection, HVAC, ceiling, and low-voltage/electrical work.

### Description

The work remodels the Southern Nevada Water Authority Water Quality Office area on the first floor, south wing of the Laboratory Building at the River Mountain Water Treatment Facility. The project includes room and office conversions, demolition, new glass windows, paint, carpeting, cabinetry, frosted nameplates, and dimmable lighting. Supporting work includes modifications to fire sprinkler and alarm systems, HVAC reconfiguration, replacement ceiling frames, tiles and baseboards, and upgrades to electrical, data, and communication systems. The engineer’s estimate is $345,611; the bid deadline is December 3, 2026, at 10:00 AM PT.

[View original listing](https://nevada.ionwave.net/PublicDetail.aspx?bidID=20886&SourceType=1)
