# Nevada Ionwave #26.MWB241.C1-BM

Civic Center tenant improvements — construction manager at risk services

**Posted:** November 17, 2026
**Respond By:** December 09, 2026
**Identifier:** 26.MWB241.C1-BM
**NAICS:** 236220, 541310

The City of Las Vegas is seeking a construction manager at risk for tenant improvements to two Civic Center office floors.
- **Buyer:** City of Las Vegas; no sub-agency or contracting office is identified.
- **Scope:** CMAR services for approximately 46,500 square feet of grey-shell office space: 29,000 square feet on Building A’s 4th floor and 17,500 square feet on Building B’s 3rd floor.
- **Services requested:** Design coordination for architectural, mechanical, electrical (including low-voltage and security), plumbing, fire-protection, and other building components; plus preconstruction reviews, cost estimating, project analysis, and advice on materials, construction methods, systems, schedule, labor, and subcontractor selection.
- **OEMs and named vendors:** None identified. No products or part numbers are specified.
- **Estimated project cost:** $16 million.

### Description

The City of Las Vegas is seeking proposals for construction manager at risk services for tenant improvements at Civic Center Building A, 4th Floor, and Building B, 3rd Floor, at 525 South Main Street and 70 East Bonneville Avenue. The project is an office buildout of two grey shell spaces totaling 46,500 square feet. Scope includes design of architectural, mechanical, electrical, plumbing, fire protection, and other building components, as well as preconstruction services such as constructability reviews, cost estimates, project analysis, and schedule and materials advice. The estimated project cost is $16,000,000; anticipated construction is scheduled to start in September 2027, with completion estimated for June 2028.

[View original listing](https://nevada.ionwave.net/PublicDetail.aspx?bidID=20850&SourceType=1)