# City of Toledo PlanetBids #10009074

Summit Street reconstruction, protected cycle track, and water-main replacement

**Posted:** November 20, 2026
**Respond By:** December 15, 2026
**Identifier:** 10009074
**NAICS:** 237310, 237110

The City of Toledo is seeking a contractor to rebuild Summit Street and deliver a protected cycle track alongside extensive water-main and drainage work.
- **Government buyer:** City of Toledo, Department of Public Utilities, Engineering Services; related project documents also identify the Department of Transportation, Division of Engineering and Construction Management, and Department of Public Works, Division of Engineering Services.
- **Project:** Summit Street Cycle Track Phase 2, solicitation 10009074; project identifiers LUC-CR-1980-10.0 and PID 117676. Work spans about one mile between New York Avenue and Manhattan Boulevard.
- **Main work:** Reconstruct pavement, curbs, driveways and sidewalks; build a protected cycle track; improve drainage; and replace about one mile of water main, including 8- to 16-inch main, valves, hydrants, services, and connections.
- **OEMs and named organizations:** No product OEMs or branded equipment vendors are specified. Labor-agreement documents name the Northwestern Ohio Building Trades Council, AFL-CIO; Northwest Ohio Building and Construction Trades Council (NWOBTC); Northwestern Ohio Building and Construction Trades Council (NWOBCTC); and affiliated local unions.
- **Notable requirements:** Prevailing wages apply, and the project documents state an 8% SBE goal. Depending on funding and applicability thresholds, a Project Labor Agreement (PLA) may be required for the contractor and subcontractors, including a pre-job conference and signed agreement. Other specified provisions include SWP3 development and inspections, pre-construction video documentation, VRAM at specified asphalt joints, traffic maintenance, and construction scheduling.
- **Contract period:** 180 days; project documents associate the period with Notice to Proceed, while the initial notice states it begins upon purchase-order issuance. No option years or annual subscription are identified.
- **Bid schedule:** Detailed construction bid items, quantities, and bid-item codes are listed in `services_line_items`.

### Description

Reconstruct approximately one mile of pavement on Summit Street from New York Avenue to Manhattan Boulevard. Work includes removing and replacing pavement, curbs, and driveway approaches; minor drainage improvements; and installing a protected cycle track along the same limits. The project also includes replacing approximately one mile of existing water main with new 8-inch, 12-inch, and 16-inch mains. Bids are submitted electronically through the City of Toledo PlanetBids portal, and an ODOT pre-qualified contractor is required.

[View original listing](https://vendors.planetbids.com/portal/22576/bo/bo-detail/148465)
