# Connecticut Portal #39428a

Curtiss Park Trail and Wetland Boardwalk Construction

**Posted:** November 21, 2026
**Respond By:** November 24, 2026
**Identifier:** 39428a
**NAICS:** 237310, 237990

The Town of Simsbury is seeking bids to build the Curtiss Park Trail in Connecticut.
- **Buyer:** State of Connecticut Department of Administrative Services Procurement; Town of Simsbury is identified as the issuing organization.
- **Project:** State Project No. 128-158, involving approximately 3,000 linear feet of bituminous-concrete multi-use trail along Tariffville Road to Curtiss/Pattison Parks.
- **River crossing and boardwalk:** The trail will cross the Farmington River using the existing Tariffville Road bridge sidewalk and include a boardwalk within and adjacent to wetlands in the river corridor.
- **OEMs and vendors:** None are identified.
- **Notable requirement:** Construction will take place in and alongside wetlands.

### Description

The project includes construction of approximately 3,000 linear feet of bituminous concrete multi-use trail along the north side of Tariffville Road. The trail will cross the Farmington River on an existing sidewalk on the Tariffville Road bridge and continue to Curtiss/Pattison Parks. A boardwalk section will be built within and adjacent to wetlands in the Farmington River riparian corridor.

[View original listing](https://webprocure.proactiscloud.com/wp-web-public/en/#/bidboard/bid/146959?pagenumber=1&customerid=51)
