# Utah Public Procurement Place U3P #HVTCP26007

Wasatch Back transit facility feasibility, benefits studies, and preliminary design

**Posted:** November 20, 2026
**Respond By:** December 11, 2026
**Identifier:** HVTCP26007
**NAICS:** 926120

High Valley Transit District is seeking a qualified consulting team to study and plan transit facility expansion in the Wasatch Back.
- **Government buyer:** High Valley Transit District (HVT), under its Special Service Districts department; project area includes Heber City and Wasatch County, Coalville and Summit County, and nearby unincorporated areas.
- **OEMs and vendors:** No OEMs, vendors, or consulting firms are named. **USDOT** is identified as the funder through its Rural and Tribal Assistance Pilot Program.
- **Requested services:** Facility site selection and feasibility analysis; economic assessment and public-benefit studies; initial/conceptual design and preliminary engineering; environmental review through the Planning and Environmental Linkages (PEL) process; project and subconsultant management; stakeholder coordination; and federal grant compliance and reporting support.
- **Potential facilities:** Secured parking, maintenance facilities, park-and-ride lots, passenger waiting areas, and administrative buildings.
- **Key requirements:** Planning and preliminary engineering must be performed or supervised by licensed architecture and engineering professionals. The work includes coordination with Heber City, Wasatch County, Coalville, Summit County, and other stakeholders. Selection is based on qualifications; pricing is not evaluated during qualification, and scope and fee are negotiated with the highest-ranked firm.
- **Performance period:** Approximately 18 months from Notice to Proceed; no renewal options are stated.

### Description

High Valley Transit District is seeking qualifications from consulting firms for feasibility and benefits studies to support expansion of transit services in the Wasatch Back, linking Heber City, Coalville, and unincorporated county areas. Work includes facility site selection, feasibility analysis, economic assessment, public benefit studies, initial design concepts, and environmental review through the Planning and Environmental Linkages (PEL) process. The selected consultant will coordinate with local governments and other stakeholders, and the project is expected to take approximately 18 months from Notice to Proceed. This is a qualifications-based selection; pricing will not be evaluated, and scope and fee will be negotiated after selection.

[View original listing](https://utah.bonfirehub.com/opportunities/263974)
