# Plano Independent School District Ionwave #CSP 2027-01-02 Addendum 2

Brinker Elementary School HVAC Controls, Chiller, RTU, and Related Systems Upgrades

**Posted:** October 30, 2026
**Respond By:** December 01, 2026
**Identifier:** CSP 2027-01-02 Addendum 2
**NAICS:** 238220, 334512

Plano Independent School District is seeking proposals to upgrade HVAC and related systems at Brinker Elementary School.
- **Buyer:** Plano Independent School District (Plano ISD), Purchasing Department / Plano ISD Purchasing, Plano, Texas.
- **Base scope:** Replace the campus HVAC controls system, existing air-cooled chillers, and three rooftop units (RTUs), with associated mechanical, electrical, and controls work.
- **Alternates and allowances:** Alternate work includes one kitchen make-up air unit (MAU) replacement with demand control ventilation and backflow-preventer replacement. A $50,000 allowance covers valves, actuators, and strainers. Visitor signage is handled through project contingency and is not required in the base bid.
- **OEMs and named vendors:** **Reliable Controls** is the only acceptable controls manufacturer/vendor and is provided by **Enviromatics**; the existing controls system is **Schneider**. **Carrier** is acceptable for the MAU (model 48WE); **CaptiveAire**, **Greenheck**, and **Grease Master** are also named in the MAU specification discussion. Existing chillers are identified as **Carrier 30RBA** units. **Solenis (formerly Chem-Aqua)** provides the district’s chemical water treatment, and **EAB** will provide testing-and-balancing pricing directly to the district.
- **Notable requirements:** Include chiller factory start-up by the manufacturer’s authorized technician in the base bid. Field-verify existing conditions, equipment counts, sizes, and chiller-pad adequacy; account for equipment-related structural work. Coordinate water treatment with Solenis. EAB’s testing-and-balancing cost is excluded from the contractor’s proposal. Unused allowance funds are returned to the owner.
- **Budget:** Estimated project budget is $1,600,000; source summaries differ on whether the $80,000 contingency and $50,000 allowance are included in that figure.

### Description

Plano Independent School District is requesting competitive sealed proposals for the Brinker Elementary School Systems & Compliance Project. The base bid includes replacing campus HVAC controls, existing air-cooled chillers, and three rooftop units, plus associated mechanical, electrical, and controls work. Alternate work includes replacement of the existing make-up air unit and associated work. The stated estimated budget is $1,600,000, with an $80,000 contingency and a $50,000 allowance for replacement of valves, actuators, and strainers.

[View original listing](https://pisd.ionwave.net/PublicDetail.aspx?bidID=2881&SourceType=1)
