# City of Tampa #27-P-00106

City of Tampa mini-split system, installation, and facility retrofit work

**Posted:** November 20, 2026
**Respond By:** November 27, 2026
**Identifier:** 27-P-00106
**NAICS:** 238220, 238190

The City of Tampa is seeking a contractor for a mini-split installation and related facility retrofit work.
- **Government buyer:** City of Tampa, Solid Waste & Environmental Program Management; contact named in an attachment: Jack Walker.
- **OEMs and vendors:** No manufacturer, OEM, or commercial vendor is identified. The mini-split brand is not specified and is subject to City approval.
- **Products requested:** One 3-ton mini-split system with a minimum SEER2 rating of 18, connected to a 240V breaker. No part number is provided.
- **Installation requirements:** Provide labor, materials, tools, and equipment; install refrigerant lines, conduit, wiring, and code-compliant disconnects; mount the condenser on the concrete roof using hurricane-wind-rated provisions and vibration isolators; install a condensate pump if needed; and properly seal roof penetrations. Submit equipment and installation plans for City approval before starting.
- **Additional attachment scope:** Operations Building fourth-floor retrofit work includes demolition of indicated walls, doors, ceilings, and fixtures; surface patching and preparation for new finishes; roof-edge concrete repair; and installation of a cage ladder and walkway arrangement. Drawing references include 01-24-0004, 01-24-0026, and 01-24-0027. The attachment identifies the McKay Bay Refuse to Energy Facility Retrofit Project, Contract 01-0083-00.
- **Quantities and pricing:** One mini-split system and one installation service are specified. Retrofit-work quantities and contract value are not stated.

### Description

The City of Tampa is requesting quotes to provide and install one 3-ton mini split for an office on the third floor of the administration building. The contractor must install the condenser on the fourth-floor roof and supply all materials, tools, and equipment. Requirements include connection to a 240V breaker, a minimum SEER2 value of 18, code-compliant disconnects, and properly sealed roof penetrations. Equipment and installation plans must be submitted to the City for approval before work begins.

[View original listing](https://procurement.opengov.com/portal/cityoftampa/projects/328007)
