Norfolk queue-detection equipment installation and ATMS improvements

**Posted:** November 19, 2026
**Respond By:** December 16, 2026
**Identifier:** 25184
**NAICS:** 238210, 237310

Norfolk is seeking a contractor to install queue-detection equipment and upgrade its Advanced Traffic Management System across several city corridors.
- **Government buyer:** City of Norfolk, Department of Public Works (including D&C) and Department of Transportation.
- **Scope:** Project 25184 / UPC 115372 covers radar-based queue detection, field equipment and central-system enhancements at Hampton Boulevard, Boush Street/Waterside Drive, and East Brambleton Avenue/St. Paul’s Boulevard.
- **Major equipment:** 13 microwave radar detectors, 5,890 linear feet of detector cable, and 11 radar cabinet interface devices (part number 801SX20-0001).
- **Other scheduled materials:** 1,735 linear feet of 2-inch HDPE Schedule 80 conduit (513SD20-0001), 495 linear feet of 2-inch PVC Schedule 40 conduit (504SX20-0009), 20 linear feet of 3/4-inch metal conduit (512SP20-0004), 5 LP-2 Type B lighting poles, 1 LP-2 Type C lighting pole, 13 JB-S1 junction boxes, and 5 LF-1 Type A concrete foundations.
- **Related work:** Install 95 units of concrete sidewalk and remove 95 units of existing sidewalk; perform 32 utility test pits; modify 11 existing cabinets and 17 junction boxes; and provide mobilization, traffic control, conduit installation, and restoration.
- **OEMs and vendors:** No equipment manufacturer or commercial vendor is named. The plans reference VDOT standards and Norfolk standard sidewalk detail HS-206.
- **Notable requirements:** Use IMSA Level II technicians for cabinet work, keep existing signal operations functioning until an approved cutover, comply with domestic-material requirements, and provide a detailed traffic control plan. The stated DBE goal is 0%.
- **Performance:** Work must begin within 10 days of the Notice to Proceed; substantial completion is required within 365 calendar days of commencement and final completion within 395 calendar days of the Notice to Proceed. Liquidated damages are $600 per calendar day for late completion.

### Description

The City of Norfolk is soliciting bids to improve its Advanced Traffic Management System. The work includes installing queue detection systems at three corridors using remote-sensing utilities, field devices, and central-system software enhancements. Construction includes traffic control, equipment and conduit installation, replacement or upgrades of detection systems, and related field work at locations including Hampton Boulevard, Boush Street, Waterside Drive, and intersections. The estimated completion period is 365 calendar days.