# Huntsville Utilities Revize #IFB 27-002

Turnkey Construction of the Northwest Expansion Substation

**Posted:** November 12, 2026
**Respond By:** November 25, 2026
**Identifier:** IFB 27-002
**NAICS:** 237990, 237130

Huntsville Utilities is soliciting a complete turnkey construction bid for its Northwest Expansion Substation in Huntsville, Alabama.
- **Buyer:** City of Huntsville, doing business as Huntsville Utilities; Purchasing Department. The bid letter names John Lones.
- **Vendors and OEMs:** **Substation Enterprises** is named as the source through which the steel package was primarily procured. No product manufacturer or OEM is explicitly identified.
- **Requested work:** Provide supervision, labor, materials, equipment, and transportation to build the substation, including foundations, equipment installation, conduit, control cable installation and terminations, site grading, stone surfacing, and restoration.
- **Owner-furnished items:** Transformer, breakers, regulators, steel package, control building, cable trench, concrete, gravel, eight yard lights, and 6-inch feeder conduit. Huntsville Utilities delivers and sets the control building and transformers; the contractor installs the furnished feeder conduit. The owner installs and terminates feeder-circuit cables.
- **Contractor-furnished items:** External conduit systems, control cable, junction boxes, termination blocks, and other needed permanent materials. Eligible materials are reimbursable with itemized receipts and the markup stated in the bid; tools and equipment are not reimbursable.
- **Notable requirements:** Install a 4-inch oil-containment drain with an accessible valve and shutoff tee for a future connection; keep the containment pit sealed, with no liner required. Complete final grading, rebar work, four layers of #57 stone, off-site spoils hauling, site restoration, and herbicide treatment. Establish foundation locations; a separate survey is not necessarily required.
- **Exclusions and duration:** Future transformer-pad and circuit-switcher foundations are excluded. The stated duration is 150 calendar days per an addendum, although the bid letter says 150 working days.

### Description

Huntsville Utilities is seeking sealed bids for construction of the Northwest Expansion Substation in Huntsville, Alabama. The contractor is to provide the supervision, labor, materials, supplies, tools, equipment, and transportation needed to perform the work; the bid documents and addenda describe owner-furnished items and other project requirements. The solicitation states a 150-calendar-day duration in Addendum 2, while the bid letter states 150 working days. Bids are due November 25, 2026, at 10:00 AM CST, and attendance at the November 13, 2026, pre-bid meeting is described as mandatory.