# Georgia Procurement Registry #PE-33957-NONST-2027-000000022

State Route 20 Water-Main Relocation and Construction

**Posted:** November 19, 2026
**Respond By:** December 17, 2026
**Identifier:** PE-33957-NONST-2027-000000022
**NAICS:** 237110

The Cherokee County Water and Sewerage Authority is seeking construction bids for water-main relocation supporting the State Route 20 widening in Cherokee County, Georgia.
- **Government buyer:** Cherokee County Water and Sewerage Authority; the work is in Canton, Cherokee County, Georgia.
- **Scope:** Relocate water mains between Union Hill Road and East Cherokee Drive and coordinate construction with the road contractor.
- **Water mains requested:**
  - 11,360 linear feet of 36-inch ductile iron pipe (DIP) water main.
  - 1,400 linear feet of 20-inch DIP water main.
  - 15,500 linear feet of 12-inch DIP water main.
  - 20,200 linear feet of 8-inch DIP water main.
- **Related work:** Water services and abandonment or removal of existing water mains.
- **OEMs and vendors:** No water-main manufacturer or product brand is specified. AtkinsRealis USA is named as Engineer of Record and as a source of plans and contract documents; it is not identified as a construction bidder or subcontractor.
- **Notable requirements:** Bidders must meet minimum project qualifications and submit required qualification materials and bid security. The successful bidder must provide performance and payment bonds.
- **Performance period:** Substantial completion is limited to 960 calendar days; final completion, including closeout, is limited to 1,640 consecutive calendar days. The work has three sections with individual time constraints.

### Description

The solicitation is for construction work to relocate water mains for the State Route 20 widening project from Union Hill Road to East Cherokee Drive. Work includes installation of 11,360 LF of 36-inch, 1,400 LF of 20-inch, 15,500 LF of 12-inch, and 20,200 LF of 8-inch DIP water main. The project includes related water services and abandonment or removal of existing water mains, with work coordinated with the road contractor. Maximum time for substantial completion is 960 calendar days, and final completion is limited to 1,640 consecutive calendar days.