# SAM #N0010427QZA18

MCM 1-Class Propeller and Stern Tube Shaft Repairs

**Buyer:** NAVSUP Weapon Systems Support (WSS) Mechanicsburg
**Posted:** November 20, 2026
**Respond By:** December 03, 2026
**Identifier:** N0010427QZA18
**NAICS:** 336612

The Department of the Navy is seeking repairs for two MCM 1-class shaft components through NAVSUP Weapon Systems Support Mechanicsburg.
- **Buyer:** Department of the Navy, NAVSUP Weapon Systems Support (WSS), Mechanicsburg.
- **Requested services:** Firm-fixed-price repair of an MCM 1-class propeller shaft (reference number 106051001-11; CAGE 07309) and stern tube shaft (reference number 106051001-12; CAGE 53711). Quantities are not specified.
- **OEMs and vendors:** No OEMs, repair vendors, or other companies are named in the provided information.
- **Requirements:** Repairs must follow the applicable statements of work, drawings, technical publications, and technical data. The requested turnaround is 330 days. Components must be marked to MIL-STD-130; quality and inspection documentation, monthly shafting status reports, applicable welding and repair records, and final repair reports and certifications are required.
- **Priority:** The work is designated as a DPAS DO-rated order.

### Description

<div>
  <p><strong>Contact Information</strong></p>
  <p>N742.9 | HRZ | N/A | kathryn.e.skutlin.civ@us.navy.mil</p>

  <p><strong>Contract Clauses and Requirements</strong></p>
  <ul>
    <li>ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)</li>
    <li>HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014): ISO 9001</li>
    <li>INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)</li>
    <li>WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023): Stand-Alone Receiving Report - Certifications; Combo Receiving Report &amp; Invoice - Material. See schedule and DD1423 where indicated. Contact the WAWF helpdesk at 866-618-5988 if assistance is needed.</li>
    <li>NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18): WSS</li>
    <li>FIRM FIXED PRICE REPAIR PURCHASE ORDERS</li>
    <li>MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE</li>
    <li>VALUE ENGINEERING (JUN 2020)</li>
    <li>INTEGRITY OF UNIT PRICES (NOV 2021)</li>
    <li>EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040) (FEB 2026)</li>
    <li>WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003): one year from date of delivery</li>
    <li>SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037) (FEB 2026)</li>
    <li>EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040) (FEB 2026)</li>
    <li>BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)</li>
    <li>NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025)</li>
    <li>SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037) (JUL 2026)</li>
    <li>WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)</li>
    <li>PROGRESS PAYMENTS (DEVIATION 2026-O0022) (FEB 2026)</li>
    <li>CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015) (JUL 2026)</li>
    <li>LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048) (MAR 2026)</li>
    <li>SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025) (FEB 2026)</li>
    <li>BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)</li>
    <li>BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)</li>
    <li>ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043) (FEB 2026)</li>
    <li>COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006) (FEB 2026)</li>
    <li>INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048) (MAR 2026)</li>
    <li>NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008)</li>
  </ul>
</div>

<div>
  <p><strong>Solicitation Information</strong></p>
  <ol>
    <li>This solicitation is being issued under emergency acquisition flexibilities.</li>
    <li>The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.</li>
    <li>Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS).</li>
    <li>All contractual documents (i.e. contracts, purchase orders, and modification(s)) related to the instant procurement are considered to be 'issued' by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce method such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to 'issue' contractual documents as detailed herein.</li>
    <li>If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility.</li>
    <li>If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on the SAM.gov website. After requesting access, send an email to the POC listed on the solicitation.</li>
    <li>Please provide repair price as Firm Fixed Price for the full repair effort of the requirement.</li>
  </ol>
  <p><strong>Requested RTAT:</strong> 330 days</p>
</div>

<div>
  <p><strong>Repair Requirement: MCM 1 Class Propeller Shaft</strong></p>
  <p><strong>1. Scope</strong></p>
  <p>1.1 Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).</p>
  <p><strong>2. Applicable Documents</strong></p>
  <p>2.1 Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).</p>
  <p><strong>3. Requirements</strong></p>
  <p>3.1 Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work), associated drawings, technical publications, document references, and DD Form 1423 CDRL's.</p>
  <p>3.2 <strong>Cage Code/Reference Number Items:</strong> The MCM 1, PROP SHAFT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.</p>
  <p><strong>CAGE — Ref. No.</strong><br>07309 — 106051001-11</p>
  <p>3.3 <strong>Marking:</strong> This item shall be physically identified in accordance with MIL-STD-130, REV N, 16 NOV 2012.</p>
  <p><strong>4. Quality Assurance</strong></p>
  <p>4.1 Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).</p>
  <p><strong>5. Packaging</strong></p>
  <p>5.1 Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).</p>
  <p>MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE</p>
  <p><strong>6. Notes</strong></p>
  <p>6.1 Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).</p>
  <p>6.2 This repair requirement has an External Statement Of Work PDF document (013124162 SOW). This document is required to perform the necessary requirements. This document should be attached to solicitations/awards. If this document does not attach to the solicitation/award, sources must contact NAVSUP WSS Contracting Officer to obtain a copy.</p>
  <p>For repair requirement: This repair requirement has an External Statement Of Work PDF document. This document is required to perform the necessary repairs. This document should be attached to solicitations/awards. If this document does not attach to the solicitation/award, repair sources must contact NAVSUP WSS Contracting Officer.</p>
</div>

<div>
  <p><strong>Data Submission Requirements — Propeller Shaft</strong></p>
  <p><strong>Date of First Submission:</strong> 030 DAC</p>
  <p><strong>Block 4:</strong> In lieu of the preparation requirements specified in DI-MGMT-80227, utilize the following format. The report shall be provided electronically in Microsoft Excel, 2010 version. Please reference the Monthly Shafting Report Template format and instructions. The status report shall be submitted electronically via electronic mail on a monthly basis. The report shall contain status based on the first working day of the month reported. Items shipped shall remain on the report for one additional month and then deleted.</p>
  <p><strong>Block 10:</strong> Status report shall be submitted monthly by the fifth working day of each month by electronic mail.</p>
  <p><strong>Block 12:</strong> The first submission shall be within 30 days of contract award.</p>
  <p><strong>Block 13:</strong> Subsequent submissions shall be submitted monthly by the fifth working day of each month.</p>
  <p><strong>Block 14:</strong> Distribution shall be made by electronic mail. Addresses for report distribution shall be obtained from the Contracting Officer.</p>

  <p><strong>Date of First Submission:</strong> 060 DAC</p>
  <p><strong>Block 4:</strong> Plan shall include the contractor's quality system procedures that meet the requirements of ASQ-9002. Additionally, the contractor shall submit inspection and test procedures for the inspection and testing of propulsion shaft plug or ring gages, other inspection fixtures or tools, jigs and other shaft related items in accordance with contract requirements.</p>
  <p><strong>Block 8:</strong> Approval will be based on compliance with contract specifications. Government requires 45 days review time.</p>
  <p><strong>Block 12:</strong> Draft copy shall be submitted for Government review no later than 60 days after contract award. Final approval copy incorporating any Government review comments shall be submitted 30 days after receipt of Government review comments.</p>
  <p><strong>Block 13:</strong> Subsequent submission to be submitted within 30 days upon development or revision of the quality system manual or inspection and test procedures or after notification by the Government that a need for a revision is required.</p>
  <p>The contractor shall provide documentation in Adobe Acrobat, version 7.0 or later.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: S4306A</li></ul>

  <p><strong>Date of First Submission:</strong> 060 DAC</p>
  <p><strong>Block 4:</strong> Submit copies of all approved welding procedure qualification test reports or associated approval letters, and applicable qualified welding procedures necessary to perform production welding.</p>
  <p><strong>Block 8:</strong> Approval will be based on compliance with contract specifications. Government requires 45 days review time.</p>
  <p><strong>Block 12:</strong> Draft copy shall be submitted for Government review no later than 60 days after BOA award. Final approval copy incorporating any Government review comments shall be submitted 30 days after receipt of Government review comments.</p>
  <p><strong>Block 13:</strong> Subsequent submission to be submitted within 30 days upon development or revision of the quality system manual or inspection and test procedures or after notification by the Government that a need for a revision is required.</p>
  <p>The contractor shall provide documentation in Adobe Acrobat, version 7.0 or later in WAWF.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: S4306A</li></ul>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> This data item shall be submitted for all anticipated unrepairable and/or out of tolerance conditions. Format and content shall be in accordance with MIL-STD-973, Appendix "E", short form in lieu of DI-CMAN-80641B. The contractor shall utilize DD Form 1694 for submission of all requests. Departures (waivers and deviations) shall be submitted for pre-existing conditions and departure from specification generated or found after the commencement of work.</p>
  <p><strong>Block 8:</strong> Approval will be based upon impact on operational performance and integrity. Government requires 30 days review time. All deviations shall be forwarded to NSWCPD 427 for approval via the DCMA Quality Assurance Representative (QAR) for review of classification of the deviation.</p>
  <p><strong>Block 10:</strong> Submission required whenever a departure from specification has occurred or is anticipated.</p>
  <p>The contractor shall provide a copy of the departure in Adobe Acrobat, version 7.0 or later.</p>
  <p><strong>Blocks 12 and 13:</strong> No later than 15 days after the need for waiver is identified.</p>
  <p>Contractor shall not estimate preparation price on DD Form 1423-1 Blocks 17 and 18. Supporting data such as drawings, sketches, photographs, calculations, financial analysis or other attachments that clarify the request for waiver shall be included.</p>

  <p><strong>Date of First Submission:</strong> ASREQ<br><strong>Date of Subsequent Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> Use the following requirement in lieu of the specified data item description. Preservation, packaging, packing, marking and transportation deficiencies of all Government furnished material shall be documented on a SF 364 and submitted in accordance with SECNAVINST 4355.18A. The cognizant Government Quality Assurance Representative (QAR) shall verify the accuracy and adequacy of the report. A copy of the appropriate Visual Preservation Inspection (VPI) report and photographs, where appropriate, shall be attached to the SF 364.</p>
  <ul>
    <li>For propulsion shaft plug and ring gages, a Visual Preservation Inspection Report, Form 9243/2 shall be completed.</li>
    <li>For propulsion shafts, a Visual Preservation Inspection Report, Form 9243/5 shall be completed.</li>
    <li>For other Government furnished material, the report shall be in the contractor's format.</li>
  </ul>
  <p><strong>Block 12:</strong> Initial Visual Preservation Inspection Report shall be submitted within 14 days of receipt of the asset.</p>
  <p><strong>Block 13:</strong> Final Visual Preservation Inspection Report shall be submitted within 14 days of completion of final packaging prior to final delivery. A hard copy of the final VPI report shall be shipped with the asset for final delivery.</p>
  <p><strong>Block 8:</strong> Approval will be based upon the accuracy, adequacy and compliance with technical requirements. Allow 10 days for Government review and acceptance.</p>
  <p>The contractor shall submit a copy of the report in Adobe Acrobat, version 7.0 or later in WAWF.</p>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> The following requirements shall be followed in lieu of the specified data item. For propulsion shafts, report format and content shall comply with the requirements of the applicable technical repair standard, NAVSEA S9243-AW-TRS-011/SHAFT and the Technical Data Package. Changes shall not be made to the inspection form format without prior approval of NSWCPD 427. Additional information and photographs shall be provided if required. A written description in the contractor's format of recommended repairs and/or items not anticipated to be repaired with appropriate justification shall be included with the pre-repair inspection report. The contractor shall submit all Liquid Penetrant (PT) inspection report/results documentation accomplished accordingly.</p>
  <p><strong>Block 8:</strong> Approval will be based upon the accuracy, adequacy and compliance with technical requirements. Allow 45 days for Government review and approval.</p>
  <p><strong>Block 12:</strong> Pre-repair inspection report shall be submitted within 120 days of receipt of the asset.</p>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> The following requirements shall be followed in lieu of the specified data item. For propulsion shafts, report format and content shall comply with the requirements of the applicable technical repair standard, NAVSEA S9243-AW-TRS-011/SHAFT and the Technical Data Package. Changes shall not be made to the inspection form format without prior approval of NSWCPD 427. Additional information and photographs shall be provided if required. The contractor shall submit all Liquid Penetrant (PT) inspection report/results documentation accomplished accordingly.</p>
  <p><strong>Block 8:</strong> Approval will be based upon the accuracy, adequacy and compliance with technical requirements. Allow 45 days for Government review and approval.</p>
  <p>A hard copy of the final repair report shall be shipped with the asset for final delivery.</p>
  <p><strong>Block 12:</strong> The final repair report shall be submitted within 14 days of completion of all repairs.</p>
  <p>The contractor shall provide a copy of the report in Adobe Acrobat, version 7.0 or later in WAWF.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: N64498</li></ul>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> DI-MISC-80678 is tailored as follows. For propulsion shafts, a certification document in accordance with NAVSEA S9243-AW-TRS-011/SHAFT shall be completed after the approval of the final inspection report. Report format shall be as provided for on the inspection forms. Changes shall not be made to the inspection form format without prior approval from NSWCPD 427. For other Government furnished equipment, the report shall be in the contractor's format. Certification documents shall be signed by the cognizant DCMA Quality Assurance Representative (QAR).</p>
  <p><strong>Block 12:</strong> Submission shall be made no later than 5 days after signature of the DCMA QAR.</p>
  <p>A hard copy of the certification data report shall be packaged with the asset for final delivery.</p>
  <p>In addition to hard copy format, the contractor shall provide a copy of the report in Adobe Acrobat, version 7.0 or later in WAWF.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: N64498</li></ul>
</div>

<div>
  <p><strong>Repair Requirement: MCM 1 Class Stern Tube Shaft</strong></p>
  <p><strong>1. Scope</strong></p>
  <p>1.1 Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work).</p>
  <p><strong>2. Applicable Documents</strong></p>
  <p>2.1 Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work).</p>
  <p><strong>3. Requirements</strong></p>
  <p>3.1 Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work), associated drawings, technical publications, document references, and DD 1423 CDRL's.</p>
  <p>3.2 <strong>Cage Code/Reference Number Items:</strong> The MCM 1, STERN SHAFT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures.</p>
  <p><strong>CAGE — Ref. No.</strong><br>53711 — 106051001-12</p>
  <p>3.3 <strong>Marking:</strong> This item shall be physically identified in accordance with MIL-STD-130, REV N, 16 NOV 2012.</p>
  <p><strong>4. Quality Assurance</strong></p>
  <p>4.1 Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work).</p>
  <p><strong>5. Packaging</strong></p>
  <p>5.1 Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work).</p>
  <p>MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE</p>
  <p><strong>6. Notes</strong></p>
  <p>6.1 Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work).</p>
  <p>6.2 This repair requirement has an External Statement Of Work PDF document (013124383 SOW). This document is required to perform the necessary requirements. This document should be attached to solicitations/awards. If this document does not attach to the solicitation/award, sources must contact NAVSUP WSS Contracting Officer to obtain a copy.</p>
  <p>For repair requirement: This repair requirement has an External Statement Of Work PDF document. This document is required to perform the necessary repairs. This document should be attached to solicitations/awards. If this document does not attach to the solicitation/award, repair sources must contact NAVSUP WSS Contracting Officer.</p>
</div>

<div>
  <p><strong>Data Submission Requirements — Stern Tube Shaft</strong></p>
  <p><strong>Date of First Submission:</strong> 030 DAC</p>
  <p><strong>Block 4:</strong> In lieu of the preparation requirements specified in DI-MGMT-80227, utilize the following format. The report shall be provided electronically in Microsoft Excel, 2010 version. Please reference the Monthly Shafting Report Template format and instructions. The status report shall be submitted electronically via electronic mail on a monthly basis. The report shall contain status based on the first working day of the month reported. Items shipped shall remain on the report for one additional month and then deleted.</p>
  <p><strong>Block 10:</strong> Status report shall be submitted monthly by the fifth working day of each month by electronic mail.</p>
  <p><strong>Block 12:</strong> The first submission shall be within 30 days of contract award.</p>
  <p><strong>Block 13:</strong> Subsequent submissions shall be submitted monthly by the fifth working day of each month.</p>
  <p><strong>Block 14:</strong> Distribution shall be made by electronic mail. Addresses for report distribution shall be obtained from the Contracting Officer.</p>

  <p><strong>Date of First Submission:</strong> 060 DAC</p>
  <p><strong>Block 4:</strong> Plan shall include the contractor's quality system procedures that meet the requirements of ASQ-9002. Additionally, the contractor shall submit inspection and test procedures for the inspection and testing of propulsion shaft plug or ring gages, other inspection fixtures or tools, jigs and other shaft related items in accordance with contract requirements.</p>
  <p><strong>Block 8:</strong> Approval will be based on compliance with contract specifications. Government requires 45 days review time.</p>
  <p><strong>Block 12:</strong> Draft copy shall be submitted for Government review no later than 60 days after contract award. Final approval copy incorporating any Government review comments shall be submitted 30 days after receipt of Government review comments.</p>
  <p><strong>Block 13:</strong> Subsequent submission to be submitted within 30 days upon development or revision of the quality system manual or inspection and test procedures or after notification by the Government that a need for a revision is required.</p>
  <p>The contractor shall provide documentation in Adobe Acrobat, version 7.0 or later.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: S4306A</li></ul>

  <p><strong>Date of First Submission:</strong> 060 DAC</p>
  <p><strong>Block 4:</strong> Submit copies of all approved welding procedure qualification test reports or associated approval letters, and applicable qualified welding procedures necessary to perform production welding.</p>
  <p><strong>Block 8:</strong> Approval will be based on compliance with contract specifications. Government requires 45 days review time.</p>
  <p><strong>Block 12:</strong> Draft copy shall be submitted for Government review no later than 60 days after BOA award. Final approval copy incorporating any Government review comments shall be submitted 30 days after receipt of Government review comments.</p>
  <p><strong>Block 13:</strong> Subsequent submission to be submitted within 30 days upon development or revision of the quality system manual or inspection and test procedures or after notification by the Government that a need for a revision is required.</p>
  <p>The contractor shall provide documentation in Adobe Acrobat, version 7.0 or later in WAWF.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: S4306A</li></ul>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> This data item shall be submitted for all anticipated unrepairable and/or out of tolerance conditions. Format and content shall be in accordance with MIL-STD-973, Appendix "E", short form in lieu of DI-CMAN-80641B. The contractor shall utilize DD Form 1694 for submission of all requests. Departures (waivers and deviations) shall be submitted for pre-existing conditions and departure from specification generated or found after the commencement of work.</p>
  <p><strong>Block 8:</strong> Approval will be based upon impact on operational performance and integrity. Government requires 30 days review time. All deviations shall be forwarded to NSWCPD 427 for approval via the DCMA Quality Assurance Representative (QAR) for review of classification of the deviation.</p>
  <p><strong>Block 10:</strong> Submission required whenever a departure from specification has occurred or is anticipated.</p>
  <p>The contractor shall provide a copy of the departure in Adobe Acrobat, version 7.0 or later.</p>
  <p><strong>Blocks 12 and 13:</strong> No later than 15 days after the need for waiver is identified.</p>
  <p>Contractor shall not estimate preparation price on DD Form 1423-1 Blocks 17 and 18. Supporting data such as drawings, sketches, photographs, calculations, financial analysis or other attachments that clarify the request for waiver shall be included.</p>

  <p><strong>Date of First Submission:</strong> ASREQ<br><strong>Date of Subsequent Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> Use the following requirement in lieu of the specified data item description. Preservation, packaging, packing, marking and transportation deficiencies of all Government furnished material shall be documented on a SF 364 and submitted in accordance with SECNAVINST 4355.18A. The cognizant Government Quality Assurance Representative (QAR) shall verify the accuracy and adequacy of the report. A copy of the appropriate Visual Preservation Inspection (VPI) report and photographs, where appropriate, shall be attached to the SF 364.</p>
  <ul>
    <li>For propulsion shaft plug and ring gages, a Visual Preservation Inspection Report, Form 9243/2 shall be completed.</li>
    <li>For propulsion shafts, a Visual Preservation Inspection Report, Form 9243/5 shall be completed.</li>
    <li>For other Government furnished material, the report shall be in the contractor's format.</li>
  </ul>
  <p><strong>Block 12:</strong> Initial Visual Preservation Inspection Report shall be submitted within 14 days of receipt of the asset.</p>
  <p><strong>Block 13:</strong> Final Visual Preservation Inspection Report shall be submitted within 14 days of completion of final packaging prior to final delivery. A hard copy of the final VPI report shall be shipped with the asset for final delivery.</p>
  <p><strong>Block 8:</strong> Approval will be based upon the accuracy, adequacy and compliance with technical requirements. Allow 10 days for Government review and acceptance.</p>
  <p>The contractor shall submit a copy of the report in Adobe Acrobat, version 7.0 or later in WAWF.</p>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> The following requirements shall be followed in lieu of the specified data item. For propulsion shafts, report format and content shall comply with the requirements of the applicable technical repair standard, NAVSEA S9243-AW-TRS-011/SHAFT and the Technical Data Package. Changes shall not be made to the inspection form format without prior approval of NSWCPD 427. Additional information and photographs shall be provided if required. A written description in the contractor's format of recommended repairs and/or items not anticipated to be repaired with appropriate justification shall be included with the pre-repair inspection report. The contractor shall submit all Liquid Penetrant (PT) inspection report/results documentation accomplished accordingly.</p>
  <p><strong>Block 8:</strong> Approval will be based upon the accuracy, adequacy and compliance with technical requirements. Allow 45 days for Government review and approval.</p>
  <p><strong>Block 12:</strong> Pre-repair inspection report shall be submitted within 120 days of receipt of the asset.</p>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> The following requirements shall be followed in lieu of the specified data item. For propulsion shafts, report format and content shall comply with the requirements of the applicable technical repair standard, NAVSEA S9243-AW-TRS-011/SHAFT and the Technical Data Package. Changes shall not be made to the inspection form format without prior approval of NSWCPD 427. Additional information and photographs shall be provided if required. The contractor shall submit all Liquid Penetrant (PT) inspection report/results documentation accomplished accordingly.</p>
  <p><strong>Block 8:</strong> Approval will be based upon the accuracy, adequacy and compliance with technical requirements. Allow 45 days for Government review and approval.</p>
  <p>A hard copy of the final repair report shall be shipped with the asset for final delivery.</p>
  <p><strong>Block 12:</strong> The final repair report shall be submitted within 14 days of completion of all repairs.</p>
  <p>The contractor shall provide a copy of the report in Adobe Acrobat, version 7.0 or later in WAWF.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: N64498</li></ul>

  <p><strong>Date of First Submission:</strong> ASREQ</p>
  <p><strong>Block 4:</strong> DI-MISC-80678 is tailored as follows. For propulsion shafts, a certification document in accordance with NAVSEA S9243-AW-TRS-011/SHAFT shall be completed after the approval of the final inspection report. Report format shall be as provided for on the inspection forms. Changes shall not be made to the inspection form format without prior approval from NSWCPD 427. For other Government furnished equipment, the report shall be in the contractor's format. Certification documents shall be signed by the cognizant DCMA Quality Assurance Representative (QAR).</p>
  <p><strong>Block 12:</strong> Submission shall be made no later than 5 days after signature of the DCMA QAR.</p>
  <p>A hard copy of the certification data report shall be packaged with the asset for final delivery.</p>
  <p>In addition to hard copy format, the contractor shall provide a copy of the report in Adobe Acrobat, version 7.0 or later in WAWF.</p>
  <p>Documents shall be submitted in WAWF utilizing the following DODAACs:</p>
  <ul><li>Inspect by: S4306A</li><li>Ship to: N64498</li><li>Accept by: N64498</li></ul>
</div>

<div>
  <p><strong>Additional Links:</strong></p>
  <p><a href="https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010427QZA18" target="_blank">See Solicitation N0010427QZA18</a></p>
</div>

[View original listing](https://sam.gov/opp/94ca08ce5b6e46ad9d4eaddc5529421b/view)
