# SAM #W912PL27BA001

USACE Phase 4 Rio De Flag Flood Control Project Construction

**Buyer:** USACE Los Angeles District
**Posted:** November 19, 2026
**Respond By:** February 11, 2027
**Identifier:** W912PL27BA001
**NAICS:** 237990

USACE is seeking a contractor to build the Lower Rio De Flag Inlet as Phase 4 of a major flood-control project in Flagstaff, Arizona.
- **Government buyer:** U.S. Army Corps of Engineers (USACE), Los Angeles District.
- **Procurement:** Firm-fixed-price construction contract for the Rio De Flag Flood Control Project, Phase 4. The estimated construction magnitude is $35 million to $50 million.
- **Scope:** Approximately 4,950.58 linear feet of flood conveyance infrastructure, including reinforced-concrete box culverts, riprap-lined and grouted-stone channels, concrete channel sections, transitions, wingwalls, inlets, junction structures, drainage connections, and headwalls.
- **Construction and site work:** Extensive soil and rock excavation, controlled blasting, groundwater dewatering, utility relocation, street restoration, traffic control, irrigation, landscaping, and plant establishment.
- **Notable requirements:** Work near active BNSF railway tracks requires railway coordination and monitoring; the project also includes relocation of a BNSF signal bungalow, contaminated-soil remediation, and underground storage tank removal. BNSF is identified for railway coordination, not as an OEM or product vendor.
- **OEMs and products:** No OEMs, product vendors, or separately itemized products are identified; the procurement is for construction services.
- **Award basis:** Lowest-priced responsive and responsible bidder.

### Description

SOLICITATION W912PL27BA001: RIO DE FLAG FLOOD CONTROL PROJECT - PHASE 4 CONSTRUCTION (LOWER RDF INLET) PRODUCT SERVICE CODE (PSC): Y1KB - CONSTRUCTION OF CANALSISSUING ACTIVITY: U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) 1. GENERAL PROCUREMENT OVERVIEW: The U.S. Army Corps of Engineers, Los Angeles District, is issuing this Invitation for Bids (IFB) to award a single, Firm-Fixed-Price (FFP) construction contract for Phase 4 (Lower RDF Inlet) of the Rio De Flag Flood Control Project in Flagstaff, Coconino County, Arizona.- Procurement Type: Invitation for Bids (IFB) conducted pursuant to FAR Part 14 and FAR Part 36 (Sealed Bidding).- Competition: Unrestricted / Full and Open Competition.- Mandatory Classification Code (PSC): Y1KB - Construction of Canals.- NAICS Code: 237990 - Other Heavy and Civil Engineering Construction (Small Business Size Standard: $45.0 Million).- Estimated Construction Magnitude: Between $35,000,000.00 and $50,000,000.00 (FAR 36.204).- Period of Performance: 1,095 calendar days from issuance of Notice to Proceed (NTP), which includes anticipated seasonal winter shutdowns during December and January.- Solicitation Release Date: On or about 4 December 2026.- Public Virtual Bid Opening: On or about 11 February 2027. 2. DETAILED PROJECT SCOPE AND ENGINEERING FEATURES: The Rio De Flag Flood Control Project is a vital flood risk management initiative in partnership with the City of Flagstaff (Non-Federal Sponsor) designed to manage and convey 100-year (1 percent Annual Exceedance Probability [AEP]) flood discharges from Upper Rio De Flag and Clay Avenue Wash through downtown Flagstaff into the Lower Rio De Flag channel. Phase 4 involves heavy civil, structural, and environmental construction in a dense, historic urban and active railroad corridor. Major components include:- Flood Conveyance Infrastructure: Construction across an adjusted alignment limit of approximately 4,950.58 linear feet (LF), featuring:  -- 1,995 LF of Reinforced Concrete Box (RCB) culverts (single and multiple-barrel sections).  -- 2,555.08 LF of riprap-lined earthen trapezoidal channel (9-inch and 21-inch stone revetment).  -- 200 LF of grouted stone channel, 100.5 LF of reinforced concrete transition structures, and 100 LF of rectangular concrete channel.  -- Concrete wingwalls, drop inlets, junction structures, side drainage connections (18-inch to 60-inch RCP), and outlet headwalls.- Earthwork and Controlled Rock Blasting: Mass soil excavation (approx. 85,000 plus CY), soft rock excavation (approx. 27,000 plus CY), and hard basalt rock excavation (approx. 21,000 plus CY). Hard rock excavation requires precision line drilling, specialized shoring, and controlled blasting under stringent vibration thresholds.- Active Railway Corridor Coordination: Culvert construction occurs within 15 feet of active Burlington Northern Santa Fe (BNSF) Railway mainline tracks and historic downtown structures. Real-time automated geotechnical monitoring (vibration/PPV, tiltmeters, ground settlement, inclinometers, and piezometers) and strict compliance with a mandatory BNSF License Agreement are required. Work also includes relocation of the San Francisco Street BNSF signal bungalow.- Environmental Remediation: Excavation, testing, handling, and off-site disposal of petroleum-contaminated soils, and decommissioning/removal of underground storage tanks (USTs) in historic downtown locations (including former Paramount, Fuel Bunkers, Creosote, and 5 Points sites).- Civil and Utility Support: Surface water diversion and control, complex groundwater dewatering (water tables 5 to 20 feet below pre-excavation surface), extensive City of Flagstaff utility relocations (water, sanitary sewer, storm drainage), street restoration, traffic control, security fencing, automated irrigation systems, exterior plantings, and a mandatory 12-month plant establishment period. 3. SUMMARY OF IFB / SEALED BIDDING PROCEDURES:- Unit Price CLIN Schedule: Bids must be submitted against established Contract Line Item Numbers (CLINs) as detailed in Section 00 10 00.- No Post-Bid Negotiations: Award will be made without discussions or negotiations pursuant to FAR 14.101 and FAR 14.408. Bids must conform in all respects to the solicitation instructions.- Virtual Bid Opening: Bids will be publicly unsealed and read aloud virtually. Specific platform login and dial-in instructions will be detailed in Section 00 21 13 and any subsequent amendments.- Basis of Award: Award will be made to the lowest-priced responsive and responsible bidder. 4. MANDATORY REGISTRATION AND WEB-ONLY DISTRIBUTION:THE GOVERNMENT INTENDS TO ISSUE THIS SOLICITATION AND ALL AMENDMENTS THROUGH THE USE OF THE INTERNET (WEB ONLY). No additional media (CD-ROMs, floppy disks, faxes, or paper copies) will be provided unless deemed necessary by the Government.- SAM.gov Access: Viewing and downloading documents requires an active registration in the System for Award Management (SAM) at https://sam.gov/content/home.- First-Time Users: Registration requires a SAM Unique Entity Identifier (UEI), active SAM registration, Marketing Partner Identification Number (MPIN), CAGE Code, and official email address.- Subcontractor Requirements: ALL prospective prime contractors and subcontractors wishing to access solicitation files must maintain an active SAM profile.- Active Registration at Award: Offerors must maintain an active SAM registration to be eligible for award (FAR 52.204-7). For Joint Ventures (JVs), the JV entity itself must have a valid SAM registration representing the joint entity.- Electronic Invoicing: Contract payment processing will be conducted electronically through PIEE / Wide Area WorkFlow (WAWF) under DFARS 252.232-7006.- Point of Entry Responsibility: It is the sole responsibility of prospective offerors to monitor https://sam.gov/content/home and PIEE frequently for any solicitation notices, files, amendments, or schedule modifications. This procurement may be delayed, canceled, or revised at any time. 5. STATUTORY AND REGULATORY HIGHLIGHTS:- Limitations on Subcontracting (FAR 52.219-14): Small businesses are reminded that under FAR 52.219-14, the prime contractor will not pay more than 85 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities (excluding material costs). Any work that a similarly situated entity further subcontracts will count towards the 85 percent subcontract limitation.- Subcontracting Plans (FAR 52.219-9 / DFARS 252.219-7003): Unrestricted large businesses must submit an acceptable Small Business Subcontracting Plan.- Bid Guarantee (FAR 52.228-1): A bid guarantee is required in the amount of 20 percent of the bid price or $3,000,000.00, whichever is less.- Performance and Payment Bonds (FAR 52.228-15): 100 percent penal amount for both Performance (SF 25) and Payment (SF 25A) bonds within 10 days of award.- Project Labor Agreement (FAR 52.222-33 / FAR 52.222-34): Executive Order 14063 policies apply to large-scale federal construction projects of $35 Million or greater.- Cybersecurity Maturity Model Certification (DFARS 252.204-7025): Bidders must possess at least a CMMC Level 1 (Self) assessment entered in the Supplier Performance Risk System (SPRS) prior to award.- Prevailing Wages (FAR 52.222-6): Mandatory compliance with Davis-Bacon Construction Wage Rate Requirements. 6. DESIGNATED CONTRACTING POINTS OF CONTACT: Direct all inquiries via email to:- Contract Specialist: Otse A. Adikhai | Otse.A.Adikhai@usace.army.mil | Phone: 213-452-3248- Contracting Officer: Tezra J. Hamilton | Tezra.J.Hamilton@usace.army.mil <br/><br/><br/><strong>Additional Links:</strong><br/><a href='https://toolbox-piee.eb.mil/' target='_blank'>Department of Defense Procurement Toolbox</a><br/><a href='https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912PL27BA001&noticeType=Presolicitation' target='_blank'>PIEE Solicitation Module Link for W912PL27BA001</a><br/><a href='https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf' target='_blank'>Registration Instructions for the PIEE Solicitation Module</a><br/><a href='https://piee.eb.mil/wbt/xhtml/wbt/sol/index.xhtml' target='_blank'>Web Based Training for the PIEE Solicitation Module</a>

[View original listing](https://sam.gov/opp/4a6ff6eb6239431b8722ff7d56c9ffd0/view)
