# Illinois BidBuy #27-422DNR-DIREC-B-54948

Propane tank installation and refurbishment at Rend Lake Resort

**Posted:** November 19, 2026
**Respond By:** December 01, 2026
**Identifier:** 27-422DNR-DIREC-B-54948
**NAICS:** 238220

Illinois seeks propane-system installation and refurbishment at Rend Lake Resort and nearby facilities in Whittington.
- **Government buyer:** Illinois Department of Natural Resources, DNR - Natural Resources, Office of Land Management.
- **Scope:** Provide labor, parts, and supplies for work at Wayne Fitzgerald State Recreational Area (Rend Lake Resort), including the Resort Conference Center, Flagship Botel, and restaurant.
- **Products requested:**
  - 4 new 1,000-gallon propane tanks: 3 for the Conference Center and 1 for Flagship Botel.
  - Replacement valves, gauges, and regulators for 6 existing tanks.
  - 8 first-stage regulators for existing Resort tanks.
  - 1 restaurant propane tank manifold system.
- **Services requested:** Install the new tanks and refurbish 6 existing tanks; install the regulators and replacement manifold; clean, surface-prepare, paint, and placard 8 existing tanks; and remove and dispose of noncompliant tanks offsite.
- **Notable requirements:** Tanks and components must comply with applicable regulations. Tank cleaning, preparation, painting, and placarding must meet Office of the State Fire Marshal requirements. At least 51% of the work must be completed by the prime contractor.
- **OEMs and named vendors:** No manufacturers, OEMs, or vendors are identified in the supplied materials.

### Description

The solicitation seeks a vendor to provide labor, parts, and supplies for propane tank work at Rend Lake Resort in Whittington, Illinois. Work includes installing four new 1,000-gallon tanks, refurbishing six existing tanks, installing eight first-stage regulators, replacing a restaurant tank manifold, and cleaning, preparing, painting, and placarding eight existing tanks. The contractor must also remove and dispose of existing noncompliant tanks; at least 51% of the work must be performed by the prime contractor. The scope requires compliance with applicable regulations and Office of the State Fire Marshal requirements.

[View original listing](https://www.bidbuy.illinois.gov/bso/external/bidDetail.sda?docId=27-422DNR-DIREC-B-54948&external=true&parentUrl=close)