# Templeton CSD Civic Plus #41

Evers Sports Park Phase 1 Construction Improvements

**Posted:** November 18, 2026
**Identifier:** 41
**NAICS:** 237990, 561730

Templeton Community Services District is seeking a contractor to build Phase 1 improvements at Evers Sports Park in Templeton, California.
- **Buyer:** Templeton Community Services District, District Engineer; project location is 20 Gibson Road, Templeton.
- **Scope:** Site clearing, grading, drainage and stormwater treatment, paving, sidewalks and ADA access, retaining walls, parking improvements, fencing, irrigation, planting, playground equipment and safety surfacing, and site amenities.
- **Named manufacturers and products:** **Playworld** playground components; **Keystone Ridge Designs** litter receptacle; **Contech Engineered Solutions LLC** Filterra BioScape stormwater vault; **Surface America** PlayBound playground surfacing; and **Gail Materials** NexPave Organic-Lock binder. Several items allow approved equals.
- **Identified playground and recreation items:** Playworld equipment is identified by the part numbers listed below; plans also specify a non-elevated aluminum 8-row, 15-foot bleacher, model NA-0815PRF_CL. Quantities are not stated for these items.
- **Notable requirements:** Contractor must hold a Class A or qualifying Class B license, comply with prevailing-wage requirements, and implement a Stormwater Pollution Prevention Plan (SWPPP). Construction access should stay near the park perimeter where practical to avoid disturbing the field.
- **Schedule and funding:** Work is expected to run approximately from late 2026 through fall 2027, with a park reopening target preceding overall substantial completion. California Department of Parks and Recreation Proposition 68 funding is up to $355,904, with a 20% District match.
- **Pricing structure:** The bid includes base construction items and additive alternatives for a concrete perimeter walkway in place of stabilized decomposed granite, a concrete mowband in place of steel edging, and additional playground equipment and surfacing.

### Description

Templeton Community Services District is requesting bids for the Evers Sports Park Improvement Project – Phase 1, located at 20 Gibson Road, Templeton, California. The solicitation includes contract documents, specifications, and construction plans for the project. A pre-bid meeting is scheduled for November 20, 2026, at 11:00 AM, and bids are scheduled to open December 3, 2026, at 4:00 PM. The response deadline is listed as “Open Until Contracted.”

[View original listing](https://templetoncsd.org/bids.aspx?bidID=41)
