# Brazos Valley Ionwave #001-02-27

Tabor-to-138 kV transmission interconnection construction

**Posted:** November 18, 2026
**Respond By:** January 12, 2027
**Identifier:** 001-02-27
**NAICS:** 237130, 221122

Bryan Texas Utilities is seeking a contractor to build the Tabor-to-138 kV transmission interconnection in Bryan, Texas.
- **Buyer and project**
  - Bryan Texas Utilities (BTU), a municipally owned utility of the City of Bryan; Purchasing Department; Brazos County, Texas.
  - Construction includes transmission facilities connecting Sam Rayburn, Tabor, and a new 138 kV substation, plus relocation of the existing 69 kV line and related distribution circuits.
- **Scope and quantities**
  - Install two 135-foot concrete monopoles and six steel monopoles, with pole-top assemblies and foundations; perform associated grounding and structure work.
  - Install approximately 13,800 feet of 1033.5 ACSR “Curlew” conductor, 11,200 feet of 72-fiber OPGW, and 1,200 feet of 3/8-inch, seven-strand EHS steel shield wire. Remove approximately 3,000 feet of existing conductor, 1,000 feet of shield wire, and three concrete distribution poles.
  - Other bid items include seven OPGW splice assemblies, six steel-pole grounding assemblies, two concrete-pole grounding assemblies, 27 conductor dampers, one compression splice, easement clearing, potholing, and related construction work.
- **Named manufacturers and vendors**
  - **VALMONT**: owner-furnished S-4 prestressed concrete transmission poles.
  - **CHM UTILITY**: owner-furnished tubular steel transmission structures.
  - **Ohio Brass**: specified 138 kV polymer insulators.
  - Messer is identified as responsible for the 138 kV substation deadend and backspan; BTU furnishes major structures, insulators, conductor, OPGW, and transmission hardware.
- **Notable requirements**
  - Contractor provides supervision, labor, equipment, tools, and specified contractor-furnished materials; BTU performs OPGW cable splicing.
  - Work must align with ERCOT-approved line clearances, which may require nighttime work; bidders must provide nighttime-work multipliers for applicable bid units.
  - The bid package identifies a 20% contingency, a $45,000 testing allowance, and $5,000 daily liquidated damages.

### Description

Bryan Texas Utilities is requesting bids for the Tabor to 138kV Interconnection Project. The work includes transmission line construction, including poles and pole-top assemblies, foundations, wire installation and removals, structure removals, and miscellaneous construction activities. Bid documents include transmission specifications, design drawings, and construction bid units. A mandatory pre-bid meeting and site visit are scheduled for December 15, 2026; bids are due January 12, 2027.

[View original listing](https://brazosbid.ionwave.net/PublicDetail.aspx?bidID=4030&SourceType=1)