# Missouri BUYS #MODOT 0000000438SL,2

MoDOT St. Joseph Salt Dome Roof Replacement

**Posted:** November 17, 2026
**Respond By:** November 24, 2026
**Identifier:** MODOT 0000000438SL,2
**NAICS:** 238160

MoDOT is soliciting bids to replace roofing on two salt dome buildings at its St. Joseph maintenance site.
- **Government buyer:** Missouri Department of Transportation (MoDOT), 31-MODOT Transportation procurement business unit; buyer of record: Logan Wilbers. The specifications reference the District Engineer and District Facilities Manager; the district is not identified.
- **Project scope:** Reroof Buildings L and M, approximately 82 and 100 feet in diameter. Remove existing roofing to decking and install complete, watertight systems; work also includes entrance roof and wall work, repairs, and related building-envelope components.
- **Roofing materials:** Architectural asphalt shingles with a minimum 30-year warranty, ice-and-water protection, underlayment, flashing, ridge ventilation, and 750 replacement metal roof vents. Up to 30 sheets of sheathing replacement are included across both buildings; bidders must provide a per-sheet price for additional damaged sheathing. The amendment specifies 5/8-inch replacement sheathing.
- **Named OEMs and vendors:** **GAF (Timberline), CertainTeed (Independence Shangle), TAMKO (Heritage and Moisture Guard Plus), Georgia-Pacific (Summit), DuPont (Tyvek), Central States Manufacturing, Air Vent, Inc. (Shingle Vent), Midwest Manufacturing, and Homex (Homex 300).** Specifications allow approved equals for certain materials.
- **Other specified construction materials:** Structural plywood and particleboard sheathing, metal roof and wall panels, panel trim, snow guards, fascia and roof-edge components, metal flashing, prefinished metal sheets, weather-barrier membranes and tapes, and multiple types of joint sealers.
- **Notable requirements:** Shingle products must meet specified fire and wind-resistance standards. Metal panels carry specified paint, chalk/fade, and perforation warranties; the snow-retention system must support 500 pounds per linear foot without deflection. A site visit is mandatory. Work begins after Notice to Proceed and must meet the stated project completion schedule.

### Description

MoDOT seeks bids to remove existing roofing materials, vents, flashing, and entrance fascia from the salt dome structure down to the decking. The awarded bidder will install manufactured-warrantied composite architectural shingles rated for 30 years or greater, ice and water barrier, synthetic underlayment, galvanized flashing, and 750 metal roof vents, along with items needed for a complete, watertight roof system. Bids may be submitted electronically or by mail, UPS, or FedEx; hard-copy bidders must email the buyer at least five business days before closing. Attendance at the site visit is mandatory for bids to be accepted.

[View original listing](https://ewqg.fa.us8.oraclecloud.com/fscmUI/redwood/negotiation-abstracts/view/abstractlisting?prcBuId=300000005255687)
