# Edmond Ionwave #B26-022 Addendum 3

Relocate an existing 0.5-million-gallon elevated storage tank and construct NE Complex water, sewer, drainage, and site improvements

**Posted:** October 22, 2026
**Respond By:** November 18, 2026
**Identifier:** B26-022 Addendum 3
**NAICS:** 237110, 237990

The Edmond Public Works Authority is seeking a contractor to relocate an existing elevated water tank and build supporting utility and site improvements for NE Complex Phase 1.
- **Government buyer:** Edmond Public Works Authority, City of Edmond, Oklahoma; City of Edmond Purchasing Department.
- **Project:** WC24-00005, NE Complex Phase 1 / Danforth Tower Relocation (TWR-3), Bid B26-022.
- **Main work:** Disassemble, relocate, and re-erect one owner-furnished 0.5-million-gallon elevated storage tank, with foundations, tank repairs and modifications, electrical, SCADA and instrumentation, water and sewer extensions, storm drainage, paving, site security, fencing, landscaping, irrigation, testing, and restoration.
- **Key quantities:** 1,235 LF of 12-inch ductile-iron water line; 92 LF of 6-inch PVC water line; 2,591 LF of 8-inch PVC sanitary sewer; 514 LF of 18-inch Class IV reinforced-concrete storm sewer; 1,535 LF of 8-foot chain-link fencing; and 800 CY of detention-pond excavation. The bid schedule also includes 1 automatic slide gate, 1 20-foot double-leaf gate, and 1 pedestrian gate.
- **Specified OEMs:** **Ameristar Perimeter Security** PassPort IS steel roll gate, Impasse Security design series; **HySecurity** Slidedriver II SD40 gate operator.
- **Notable requirements:** Contractors must verify existing site conditions and utilities, address lead-based-paint assessment and asbestos removal, and provide pre- and post-construction video documentation. Work is limited to weekdays during stated working hours; weekend work is prohibited. Substitutions or equals will not be evaluated during bidding.
- **Allowances and schedule:** Bid allowances include $10,000 for permitting, $200,000 for miscellaneous metal repairs, and $250,000 for owner contingency. The stated completion period is 580 calendar days, including up to 180 days for submittals, procurement, and preconstruction and 370 days from construction notice to proceed to substantial completion. An early-completion incentive is $1,000 per day, capped at $90,000.

### Description

The Edmond Public Works Authority is soliciting bids for Phase 1 of the NE Complex project, including relocation of one existing 0.5 million-gallon elevated storage tank from the Danforth Pump Station site to the new NE Complex site. Work also includes demolition of existing tank foundations and components, construction of foundations and ancillary systems, electrical and piping work, SCADA and instrumentation, site work, and water and sanitary sewer extensions. The bid documents specify a 580-calendar-day contract period, and bidders must attend the mandatory in-person pre-bid meeting to be eligible to submit a bid. Work hours are Monday through Friday, 8:00 a.m. to 5:00 p.m.; weekend work is not permitted.