# Blinn College Ionwave #239 Addendum 1

Blinn College District Blinn Boulevard paving replacement and related roadway work

**Posted:** October 31, 2026
**Respond By:** November 23, 2026
**Identifier:** 239 Addendum 1
**NAICS:** 237310

Blinn College District seeks a paving contractor to replace roadway pavement on Blinn Boulevard at its Bryan Campus.
- **Buyer:** Blinn College District, Purchasing Department; Blinn-Bryan Campus, Bryan, Texas. Bleyl Engineering prepared the project documents.
- **Scope:** Two bid areas between Lots H and F include traffic control, asphalt and base removal, 8-inch concrete pavement, pavement markings, speed-bump removal and salvage, and erosion controls.
  - **Bid Area 1:** Remove and replace 1,280 square yards of pavement; place and remove 30 linear feet of temporary erosion-control logs.
  - **Bid Area 2:** Remove and replace 795 square yards of pavement and install one white stop bar.
- **Named OEM:** **Barco Products** — two 14.5-by-2.93-foot vulcanized rubber speed humps, SKU 06JB3SHC, or an approved equal. This is an alternate; the other speed-hump alternate is two concrete humps. Both alternatives require two W17-1 signs.
- **Other alternates:** Fire-lane markings (875 linear feet in Area 1; 620 linear feet in Area 2), a 4-foot curb cut with 5 square yards of slope paving, cosmetic grout repair of one drainage inlet, and replacement of 40 linear feet of curb and gutter. The 80-foot curb-and-gutter alternate was deleted.
- **Notable requirements:** If both areas are awarded, they cannot be under construction concurrently; schedules must allow a 7-day concrete cure. Proposals are evaluated on qualifications, experience and references, lead personnel, schedule, cost, and completeness. Bid forms include owner contingencies of $22,500 for Area 1 and $7,500 for Area 2.

### Description

Blinn College District is requesting competitive sealed proposals for paving contractor services for paving repairs on Blinn Boulevard between Lot H and Lot F at the Blinn-Bryan Campus. The work includes removal of existing asphalt pavement and base, installation of concrete pavement, pavement markings, traffic control, and other specified items across two bid areas. Construction is anticipated to begin May 10, 2027, and must be completed by July 31, 2027. Proposals are due November 23, 2026, at 2:00 PM CT.

[View original listing](https://blinn.ionwave.net/PublicDetail.aspx?bidID=70&SourceType=1)