# SAM #REQUIREMENTS-27-0637

NOAA Milford Laboratory Structural Assessment and Temporary Shoring

**Buyer:** DEPT OF COMMERCE NOAA EAD-NORFOLK-SAP
**Posted:** November 18, 2026
**Respond By:** November 30, 2026
**Identifier:** REQUIREMENTS-27-0637
**NAICS:** 541330

NOAA is seeking structural engineering support to assess and stabilize its Milford Laboratory’s Building 1.
- Government buyer: Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service (NMFS), Northeast Fisheries Science Center (NEFSC), Milford Laboratory.
- Scope: Inspect Building 1, with focused assessments of Rooms 16 and 24; map suspected concrete delamination; identify causes and recommend remediation; and provide photographs, crack mapping, cost estimates, and an inspection report.
- **OEM/product:** SureBuilt Standard Post Shore 350 (SBPS350), quantity 14. These Government-furnished adjustable shores are rated from 6,445 lb to 4,400 lb depending on extension, with a 66–115 inch height range.
- Services also include a stamped temporary-shoring design and calculations, supplemental installation materials and labor, and a structural monitoring plan. Monitoring and maintenance are required every two months for 12 months; the shoring is expected to remain in place for approximately 24 months.
- Designs and calculations must be stamped by a Connecticut-licensed professional engineer. The contractor is responsible for equipment, rentals, materials, labor, permits, testing, and fees.
- Period: One base year for assessment, shoring, and initial monitoring, plus three one-year options for continued monitoring and maintenance. No other OEMs or vendors are named.

### Description

<p>The NEFSC is seeking a contractor to provide structural engineering services to evaluate multiple instances of observed structural distress within Building # 1 at the National Marine Fisheries Service (NMFS) Northeast Fisheries Science Center (NEFSC) Milford Lab in Milford, Connecticut. The Contractor will perform a comprehensive structural assessment, provide an inspection report, deliver a temporary shoring design using Government Furnished post shores, and implement a monitoring program.</p>

[View original listing](https://sam.gov/opp/b5d1a1c25ab146c4825dd115818af990/view)
