# SAM #140PP027B0008

Boca Chita Key shoreline revetment, erosion control, and landscape restoration

**Buyer:** NATIONAL PARK SERVICE CONTRACTING ACTIVITY
**Posted:** November 17, 2026
**Identifier:** 140PP027B0008
**NAICS:** 237990

The National Park Service seeks shoreline stabilization and restoration at Boca Chita Key in Biscayne National Park.
- **Government buyer:** U.S. Department of the Interior, National Park Service (NPS); Southeast Region and Denver Service Center are identified, with Biscayne National Park as the project location.
- **Project:** Reclaim and stabilize the northeast shoreline of Boca Chita Key with about 315 linear feet of rock revetment, approximately 723 cubic yards of dredging across a 3,900-square-foot area, associated fill, erosion controls, and landscape restoration. No imported fill is permitted.
- **Materials and quantities:** Approximately 900 cubic yards of angular riprap, 130 cubic yards of No. 57 stone, 6 sea grape plants, 60 white mangroves, 64 red mangroves, and 11,694 square feet of seashore paspalum sod/seed. Additional specified materials include nominal 50-pound toe stone, geotextile fabric, Type II floating turbidity barriers, and Type III silt fence; quantities are not provided for these items.
- **Material requirements:** Riprap is 16–24 inches, with specific gravity of at least 1.8, and may be limestone, coral rock, or an approved equal. No. 57 stone is used for bedding and to chock the revetment. Geotextile, barriers, and silt fence must meet the cited AASHTO, FDOT, plan, and permit requirements.
- **Work and logistics:** Services include mobilization, site preparation and excavation, chain-link safety fencing, turbidity and erosion control, revetment construction, planting, and plant maintenance. The contractor must transport personnel, materials, equipment, fuel, and water to the island by vessel or barge and manage loading, offloading, and related marine logistics.
- **Environmental and site protections:** Protect mangroves, seagrass, historic resources, existing vegetation, and public access. Monitor turbidity during in-water work, follow permit conditions, and correct work if monitoring limits are exceeded. Rock revetment includes a one-year warranty.
- **Value and schedule:** Estimated project magnitude is $1 million–$5 million; anticipated performance duration is 220 days.
- **OEMs and named vendors:** No product manufacturers, OEMs, or commercial vendors are identified in the provided materials.

### Description

This Notice serves as a Pre-Solicitation Synopsis for upcoming work required by the National Park Service at Boca Chita Shoreline - BISC. This is not a solicitation. Responses to this Notice are not required. <br/>The NPS anticipates soliciting SAM.Gov on a Total Small Business Set-Aside basis for Erosion Control/Mitigation at the aforementioned site. <br/><br/>NAICS: 237990<br/><br/>Wage Determination: Davis Bacon Wage Determinations will apply for all counties where work takes place (Florida).<br/><br/>Selection Method: FAR 14 Sealed Bidding<br/><br/>Anticipated Period of Performance: 220 Days<br/><br/>Estimated Project Magnitude: $1M - $5M<br/><br/>Attached for consideration are the A&E developed Specifications & Drawings. <br/>Please be on the lookout for the official solicitation early to mid-December 2026 which will be posted on Sam.Gov.<br/><br/>CO: Cole Johnson, Cole_Johnson@ios.doi.gov<br/>COR: Laura Sherwood, Laura_Sherwood@nps.gov