# City of Laredo Ionwave #FY26-ENG-67

Colombia Solidarity Bridge No. 3 Office Building Roof and Ceiling Repairs

**Posted:** November 16, 2026
**Respond By:** December 10, 2026
**Identifier:** FY26-ENG-67
**NAICS:** 238160, 238310

The City of Laredo is seeking a contractor to replace the roof and repair water-damaged interior ceilings at the Colombia Solidarity Bridge No. 3 office building.
- **Government buyer:** City of Laredo, Engineering Department; the City Secretary’s Office is also identified in the solicitation materials. Project location is Laredo, Webb County, Texas.
- **OEMs and vendors:** No roofing, insulation, or ceiling manufacturers or specific vendors are named. No product part numbers are provided.
- **Roofing:** Remove and dispose of the existing roof, inspect and repair the deck and substrate as needed, and install approximately **5,000 square feet of commercial-grade, 60-mil TPO roofing** with compatible insulation, flashing, drainage details, and accessories. The system must be fully adhered unless the City approves another method, and the completed roof must be watertight.
- **Ceilings:** Replace approximately **7,500 square feet of 2 ft. x 4 ft. suspended ceiling tiles**, repair or replace damaged grid components, and install interior fiber insulation in affected areas.
- **Related work:** Address roof drains, parapets, roof edges, penetrations, flashing, and roof-to-wall connections; provide temporary weather protection, cleanup, product submittals, photographs, and closeout documentation.
- **Notable requirements:** Materials must be new, commercial-grade, and compatible. Minimum workmanship coverage is five years for roofing and one year for ceiling work. BABAA requirements apply to structural and reinforcement steel. The bid includes a City-controlled **$35,000 contingency allowance** for authorized unforeseen conditions or City-directed work.
- **Contract duration:** 150 working days; no option periods or annual subscription are stated.

### Description

The City of Laredo is seeking bids for maintenance of the Colombia Solidarity Bridge No. 3 Office Building roof. Work includes removing and replacing the existing TPO roofing system, addressing roof conditions contributing to water intrusion, and replacing water-damaged suspended ceiling tiles and related damaged ceiling-grid components in affected areas. The scope specifies a new 60-mil TPO system over approximately 5,000 square feet and replacement of approximately 7,500 square feet of ceiling tile. The contract duration is 150 working days, and the scope includes a $35,000 City-controlled contingency allowance.

[View original listing](https://cityoflaredo.ionwave.net/PublicDetail.aspx?bidID=4181&SourceType=1)