# Minnesota Supplier Systems #2000018906

Engineering services for Minnesota Judicial Building HVAC controls and VAV upgrade

**Posted:** November 16, 2026
**Respond By:** January 13, 2027
**Identifier:** 2000018906
**NAICS:** 541330, 541310, 541350, 236220, 238220, 238210

Minnesota is seeking engineering design and construction-management services for an HVAC controls and VAV upgrade at the Judicial Building in St. Paul.
- **Government buyer:** Minnesota Department of Administration, Real Estate and Construction Services (RECS), State Capitol Complex.
- **OEM:** **Honeywell** — the project calls for current Honeywell controllers; no controller model or part number is identified.
- **Requested services:** Architectural, structural, mechanical, electrical, and low-voltage engineering and project management for project **02JC0046**, listed as one project line item (quantity 1).
  - Replace existing HVAC controllers and VAV boxes, with associated piping replaced as needed.
  - Provide design from schematic design through post-construction, bidding support, construction administration, and periodic site observation.
  - Coordinate with Honeywell and support engagement of third-party testing and balancing and HVAC commissioning providers.
- **Notable requirements:** Construction is to occur off hours with minimal disruption to building operations. The fee proposal allocates basic services across design, bidding, construction administration, and post-construction phases; no fee amounts are provided.
- **Schedule:** Anticipated initial contract term is two years, with possible extensions totaling up to three additional years. The tentative project plan includes design, bidding, construction, and closeout; construction is expected to take approximately 12 months, including lead time.
- **Products and pricing:** No equipment quantities beyond the single project line item, equipment part numbers, or contract price are specified.

### Description

The Minnesota Department of Administration is seeking proposals for architectural, structural, mechanical, and electrical engineering services, including low-voltage work, to design and manage construction. The project will replace all existing controllers with current Honeywell controllers at the Judicial Building in the State Capitol Complex in St. Paul, Minnesota. A mandatory site visit is required, and only firms or persons attending will be considered for selection. Proposals are due January 13, 2027, at 12:00 p.m. CST.

[View original listing](https://guest.supplier.systems.state.mn.us/psp/fmssupap/SUPPLIER/ERP/c/SCP_PUBLIC_MENU_FL.SCP_PUB_BID_CMP_FL.GBL)
