# Midwest City Civicplus #24

GRIT Building South Roof Replacement and North Roof Repairs

**Posted:** November 17, 2026
**Respond By:** December 15, 2026
**Identifier:** 24
**NAICS:** 238160

The Midwest City Municipal Authority is seeking a contractor to replace and repair roofing at its Water Resources Recovery Facility GRIT Building.
- **Government buyer:** Midwest City Municipal Authority, Public Works Department (also identified as Midwest City Public Works), Midwest City, Oklahoma.
- **Scope of work:** Replace the South roof section and perform specified repairs to the North roof section.
  - South section: approximately 5,699 square feet; remove existing roofing and insulating concrete to the structural deck, redeck skylights, and install tapered insulation, cover board, a three-ply hot-applied built-up asphalt roof, stone surfacing, perimeter metal, pitch pans, and a replacement area divider.
  - North section: approximately 5,584 square feet; seal penetrations and flashing seams, repair membrane defects and joints, address loose lightning-rod-system fasteners, seal skylight joints, and repair a penthouse door frame. Dimensions are to be verified by the contractor.
- **OEM and specified materials:** **Tremco CPG Inc.** is the basis-of-design manufacturer. Named materials include Tremco THERMglass Premium Type VI and Premium III Adhesive, along with other Tremco materials. Structodek cover board is also specified. No product part numbers or procurement quantities are provided.
- **Performance and warranties:** Complete the work within 90 consecutive calendar days after the Notice to Proceed. The specified manufacturer roof-system warranty is 20 years; installer warranties are 5 years for the South replacement and 2 years for North repairs. Manufacturer inspections are specified during years 2, 5, 10, and 15.

### Description

The Midwest City Municipal Authority is soliciting sealed bids for replacement of the Water Resources Recovery Facility GRIT Building roof. Work is described in the bid specifications and contract documents, which include roof specifications, a roof plan, and detail drawings. A mandatory pre-bid conference and site visit is scheduled for November 30, 2026, at the Water Resources Recovery Facility Main Control Building. Bids are due December 15, 2026, and the Authority expects to consider award to the lowest and best bidder meeting specifications.

[View original listing](https://www.midwestcityok.org/bids.aspx?bidID=24)
