# New York State Contract Reporter #2140940

Construct a 320-well geothermal wellfield and improve the Parker Hall parking lot at SUNY Buffalo

**Posted:** November 17, 2026
**Respond By:** December 16, 2026
**Identifier:** 2140940
**NAICS:** 237990, 238990, 238290, 238210, 237310

The State University Construction Fund is seeking a contractor to build the Parker Hall geothermal wellfield and restore related parking lot infrastructure at SUNY Buffalo.
- **Buyer and location:** State University Construction Fund, New York State, Procurement office; SUNY Buffalo in Buffalo, Erie County, New York.
- **Construction scope:** Install and interconnect 320 geothermal wells, approximately 750 feet deep, beneath an approximately 4.5-acre parking lot. Route piping to a concrete vault with a capped manifold for future connection and install geothermal piping at least 6 feet below existing grade.
- **Related work:** Modify grading and drainage, connect to retained storm drainage as needed, install parking lot lighting electrical infrastructure, reinstall EV charging stations, and pave and stripe the lot.
- **Named organizations:** Perkins Eastman is identified as the technical project contact; BluEdge is identified as the source for project plans. No equipment OEMs, branded products, or product part numbers are specified.
- **Notable requirements:** Participation goals are 3% SDVOB, 10% MBE, and 10% WBE; workforce goals are 10% minority and 3% female.
- **Duration:** 609 calendar days after receipt of the Notice to Proceed.

### Description

The project will install a 320-well geothermal wellfield in an approximately 4.5-acre parking lot at SUNY Buffalo, with wells drilled approximately 750 feet deep. Wells will be interconnected and routed to a concrete vault with a capped manifold for future connection, and geothermal piping will be installed at least 6 feet below existing grade. Work also includes grading and drainage modifications, electrical infrastructure for parking lot lighting, and reinstallation of electric vehicle charging stations. The parking lot will be paved and striped upon completion.