# SAM #RFP-SC-27-723

Fixed-price gas cabinet supply and installation across three Ames National Laboratory buildings

**Buyer:** Ames Laboratory
**Posted:** November 16, 2026
**Respond By:** January 08, 2027
**Identifier:** RFP-SC-27-723
**NAICS:** 238290

Ames National Laboratory is seeking a fixed-price contractor to furnish and install hazardous and flammable gas cabinets across three laboratory buildings.
- **Buyer:** U.S. Department of Energy, Ames National Laboratory (Ames Laboratory), Facilities and Engineering Services; the laboratory is operated by Iowa State University.
- **Scope:** Provide cabinets, installation, associated exhaust ductwork and controls, process connections, and required mechanical, electrical, plumbing, and fire-suppression modifications at Spedding Hall, Metals Development, and Wilhelm Hall.
- **Cabinet quantities:** Drawings identify 36 cabinet locations: 34 new cabinets and 2 existing cabinets to remain. Most serve hydrogen or hydrogen-argon mixtures; other specified gases include methane mixtures, carbon monoxide/hydrogen, ammonia mixtures, and hydrogen fluoride. Cabinet capacities, room locations, exhaust airflow, and sprinkler needs vary by drawing.
- **Named OEMs/manufacturers:** **USA Safety** is the basis-of-design cabinet manufacturer. **Antec Controls** and **Phoenix Controls** are listed manufacturers for constant-volume venturi air valves. No cabinet model numbers or manufacturer part numbers are provided.
- **Other requested work:** Cabinet airflow testing and balancing, airflow visualization, and at least two hours of owner personnel training. The proposal includes a base bid and six alternates.
- **Notable requirements:** Follow Ames Lab safety and quality requirements, prepare project-specific hazard assessments and work plans, use qualified personnel, coordinate shutdowns and exhaust tie-ins, verify potential asbestos/radiation/beryllium hazards, and meet applicable fire, worker-protection, and airflow-testing standards. Owner-provided abatement and electrical gear are identified in the project manual.
- **Performance:** The project manual indicates an approximately four-month construction window in early to late 2027; the schedule may change with award and a final completion date is not stated.

### Description

<p>Ames Laboratory, under a prime contract with the U.S. Department of Energy (DOE), has a requirement for construction. With this Request for Proposal (RFP), you are invited to furnish a fixed-price proposal for this requirement. All work is to be performed in accordance with Appendix B: Project Manual and Drawings Dated 11/16/2026.</p>

<p>This RFP is for the purchase and install of Hazardous and Flammable Gas Storage Cabinets. This RFP includes a request for a base bid and several alternate bids.&nbsp; There is a mandatory pre-proposal meeting and project site tour.&nbsp;</p>

[View original listing](https://sam.gov/opp/48031ad2f21a4881937dae367a9d294f/view)
