# Thousand Oaks Opengov #REQ-27-14

Replace filter media in five pressure filters at the L. R. Dingle Water Treatment Plant

**Posted:** November 16, 2026
**Respond By:** December 16, 2026
**Identifier:** REQ-27-14
**NAICS:** 238990, 562910

The City of Frederick’s Water Treatment Department is seeking a contractor to renew media in five pressure filters at the L. R. Dingle Water Treatment Plant.
- **Buyer and project**
  - City of Frederick, Water Treatment Department; Lester R. Dingle Filter Media Replacement (REQ-27-14).
  - Work concerns five existing 11-foot-diameter vertical pressure filters.
- **Requested products and services**
  - Remove existing silica gravel, sand, and anthracite by industrial vacuum excavation and dispose of the material legally at an approved offsite facility.
  - Supply and install, in each filter, four grades of NSF 61-certified silica support gravel totaling 16 inches: 1 × 5/8 inch (6 inches deep), 5/8 × 3/8 inch (4 inches), 3/8 × 3/16 inch (3 inches), and 3/16 inch × #10 (3 inches). Gravel must meet AWWA B100 or its latest version.
  - Supply and install 24 inches of silica sand per filter, with 0.45–0.50 mm effective size and a maximum uniformity coefficient of 1.5; and 12 inches of anthracite per filter, with 0.60–0.80 mm effective size and a maximum uniformity coefficient of 1.75. Media must be NSF 61 certified and meet applicable AWWA B100 requirements.
  - Provide five new 12 × 16-inch elliptical tank manway gaskets. No part numbers or media OEM are specified.
  - Inspect interior piping and fittings and report their condition; any City-directed remediation is additional work.
- **Notable requirements**
  - Coordinate with the plant-upgrade contractor and work on one filter at a time.
  - Provide updated shop drawings and media certifications; backwash, skim, and disinfect each bed. City staff inspect beds before return to service, and the City is responsible for required regulatory or bacteriological testing.
  - Media manufacturers are not prescribed; the stated specifications and certifications govern.
- **OEMs and vendors mentioned**
  - **Roberts Filter Manufacturing Company** (also referenced as Filter Manufacturing Company) is identified in engineering drawings for the existing filter system. Drawing references also name **Weksler, Imperial, Poly-Tite, Mercoid, Tnemec, Harvel, Victaulic, and APCO**; these are not designated sources for the replacement media.
  - Surety2000 is named as a bond-filing support service, not as a product manufacturer.
- **Other items described in the engineering-drawing attachment**
  - Five pressure filter vessels, five sets of filter internals, five influent headers, and five effluent headers are shown as existing system equipment, not as replacement items in the media scope.
  - Drawings also identify five gauge panels with differential pressure switches (part number A-8808-3) and a filter-control/telemetry system (BIF Model 245-05); these are not specified as requested purchases.
- **Schedule**
  - Notice to Proceed is anticipated within six months after contract execution, with at least 30 days’ notice before onsite work. Completion follows a mutually agreed schedule; a two-year maintenance bond applies after final acceptance.

### Description

The City of Frederick seeks proposals to replace the existing filter media in five pressure-vessel filters at the L. R. Dingle Water Treatment Plant. Work includes removing and disposing of the existing gravel, sand, and anthracite; inspecting internal piping and fittings; and supplying and installing specified new filter media and manway gaskets. The contractor must coordinate the work with the plant-upgrade contractor, complete the filters one at a time, and backwash, skim, and disinfect the beds before inspection and return to service. A mandatory pre-proposal meeting/site visit is required, and responses are due electronically through the City’s OpenGov Portal.

[View original listing](https://procurement.opengov.com/portal/cityoffrederickmd/projects/306599)