# Fontana Planet bids #DE-27-62-SB

Oldtimers Phase 2 renovation and building improvements

**Posted:** November 12, 2026
**Respond By:** December 10, 2026
**Identifier:** DE-27-62-SB
**NAICS:** 236220, 238220, 238210, 238160, 238130, 238190

The City of Fontana is seeking a contractor for Phase 2 renovations at the Oldtimers project in Fontana, California.
- **Buyer:** City of Fontana, Purchasing; the plan set also identifies Deputy City Manager Phillip Burum.
- **Work requested:** One lump-sum construction project at 8572 Sierra Avenue, covering facade and storefront remodeling, fire sprinklers and a manual fire alarm, rear exterior stairs, a trash enclosure, elevator and shaft completion, second-floor restrooms, raising the roof diaphragm, extending the parapet, and installing new TPO roofing. Specifications also cover related plumbing, HVAC, electrical, lighting, siding, doors, and finishes.
- **Important requirements:** The building is being prepared as a warm shell for future restaurant and golf simulator use. Phase 3 fit-out, including kitchen and bar equipment, seating, and golf simulators, is planned separately and is not part of this Phase 2 purchase. The fire sprinkler system is specified to NFPA 13; completion is required within 130 working days from the Notice to Proceed.
- **Named OEMs and products:** **Simpson Strong-Tie** connectors, including HDUE7-SDS3 holdown; **Crossfield Products Corp.** Dex-O-Tex Weatherwear deck surfacing; **Bradley** grab bar model 8120-059-3652 or equal; **McElroy Metal** 238T standing-seam roof system; **James Hardie** fiber-cement siding; and **Johns Manville** TPO roofing. These are specification references, not stated exclusive-source requirements.
- **Award status:** No awarded contractor is identified.

### Description

The City of Fontana is soliciting electronic bids for Phase 2 improvements to the OldTimers Renovation Project. Work includes construction and remodeling of the front façade and storefronts, fire sprinklers, rear exterior stairs, trash enclosure, elevator shaft, and second-floor restrooms, as well as raising the existing roof diaphragm. The contractor is responsible for Phase 2 improvements identified or implied by the construction plans unless the plans specify that others will perform them; required specifications are provided in the attachments. A Class B contractor’s license is required, and the bid response deadline is December 10, 2026.

[View original listing](https://vendors.planetbids.com/portal/14391/bo/bo-detail/148259)
