# SAM #47PB5227R0007

Construction services to replace the Richford Land Port of Entry in Vermont

**Buyer:** GSA PBS R2 Capital Construction Branch
**Posted:** November 13, 2026
**Respond By:** December 24, 2026
**Identifier:** 47PB5227R0007
**NAICS:** 236220

GSA is seeking a contractor to replace the Richford Land Port of Entry in Vermont.
- **Government buyer:** General Services Administration (GSA), Public Buildings Service (PBS), Capital Projects – Zones 3 & 4 Branch. The new facility will support U.S. Customs and Border Protection (CBP), part of the Department of Homeland Security (DHS).
- **Requested work:** Demolish the existing historic building and construct a new Land Port of Entry facility. The contractor must provide construction labor, equipment, tools, materials, supplies, travel, management, supervision, and coordination.
- **Requirements:** The work must align with GSA Design Excellence and Operational Excellence guidelines, GSA PBS Core Building Standards, the DHS CBP Design Guide, and applicable building codes and regulations.
- **OEMs and vendors:** No product manufacturers, OEMs, or commercial vendors are identified.

### Description

<p>This project will demolish the existing historical building and construct a new facility to meet the mission of Customs and Border Protection (CBP). The new port will adhere to the GSA Design Excellence and Operational Excellence 1 GSA PBS Office of Acquisition Management guidelines, the GSA PBS Core Building Standards, and the U.S. Department of Homeland Security (DHS) CBP Design Guide.&nbsp; &nbsp;The Contractor shall furnish all construction services, labor, equipment (except as otherwise provided), tools, materials, travel, supplies, management and supervision necessary to perform all work in accordance with the Statement of Work, and must plan, schedule, coordinate and assure effective performance of all services needed during the construction phases. All work performed and all materials provided under this contract shall comply with and/or shall be with knowledge and forethought of applicable federal, state and local building codes based on the requirements of the current edition of recognized and acceptable building standards, codes and regulations. The Contractor shall have full responsibility for all construction related to the project scope.</p>

[View original listing](https://sam.gov/opp/3716668c08664fdea498b0e37827fc5e/view)
