# SAM #140FF027Q0076

Hazardous-material surveys of four Arctic National Wildlife Refuge structures

**Buyer:** FWS CONTRACTING ACTIVITY
**Posted:** November 13, 2026
**Respond By:** November 19, 2026
**Identifier:** 140FF027Q0076
**NAICS:** 541380, 541620

The U.S. Fish and Wildlife Service needs hazardous-material surveys of four structures at Lake Peters in Alaska’s Arctic National Wildlife Refuge.
- **Government buyer:** Department of the Interior, U.S. Fish and Wildlife Service (FWS), Arctic National Wildlife Refuge; contracting office: FWS, SAT Team 1. The attachment identifies Oscar Orozco as the buyer contact.
- **Requested service:** Asbestos, lead-based paint, and PCB paint inspections and sampling, laboratory analysis, reporting, and remediation cost estimates. Abatement and demolition are excluded.
- **Structures and testing:** Four wood buildings—Sleeping Cabin (asset 10035450; 484 sq. ft.), Outhouse (48 sq. ft.), Dining Hall (asset 10035451; 360 sq. ft.), and Equipment Warehouse (asset 10035452; 320 sq. ft.). Asbestos testing covers all four; lead testing covers the cabin, dining hall, and warehouse; PCB paint testing covers the cabin and dining hall.
- **Requirements:** Contractor provides qualified staff and laboratories, remote-site transportation and lodging or camping, meals, equipment and sample transport, sample handling, cleanup and patching or sealing of sampling locations, documentation, reports, and cost estimates. Safe seasonal aircraft access affects fieldwork.
- **OEMs and vendors:** No OEMs, commercial vendors, or survey equipment brands are named.
- **Performance:** Work is to be completed within four months of award. Field sampling is due within 90 days of award; the draft report is due within 14 days after sampling, and the final report within seven days after Government comments.

### Description

AK-ARCTIC NWR- ASBESTOS, LEAD BASE PAINT The Contractor shall furnish all qualified personnel, equipment, supplies, sampling materials, laboratory services, transportation, lodging or camping, meals, equipment transport, sample shipment, documentation, and reporting required to survey the identified structures for asbestos-containing materials (ACM), lead-based paint (LBP), and PCB paint before planned maintenance, repair, renovation, demolition, or deconstruction.

[View original listing](https://sam.gov/opp/2870bc3d8343481e9c8408c9fafe3943/view)
