# South Carolina Business Opportunities #69926

Design, permitting, and construction services for a phased RV campground

**Posted:** November 05, 2026
**Respond By:** November 19, 2026
**Identifier:** 69926
**NAICS:** 541330, 541310, 541370, 237990

The Irmo Chapin Recreation Commission seeks professional services to plan and deliver the first phase of an RV campground in Columbia, South Carolina.
- **Government buyer:** Irmo Chapin Recreation Commission (ICRC), Planning & Development.
- **Requested services:** Architecture and/or engineering for campground design, engineering, permitting, and construction administration.
  - Phase I includes approximately **30 full-hookup RV campsites** with water, sewer, electrical, and Internet service; a centrally located bathhouse; entrance improvements; internal roads; and supporting infrastructure.
  - Work includes construction drawings designed to accommodate future phases, recreational and transportation assessments, permits and approvals, easements, cost estimates, bid documents, and construction oversight.
- **Coordination and requirements:** Coordinate with applicable authorities, including FERC, EDA, and the Corps of Engineers. Address utility coordination, surveys, studies, permitting, and anticipated project costs. Plans are to be prepared in AutoCAD, with final deliverables compatible with ICRC systems.
- **Project context:** The project is funded through the Land and Water Conservation Fund and supports access to a 10.5-mile multi-use trail. Proposals must demonstrate the ability to meet a two-year grant-related timeline and support phased delivery, realistic budgets, and cost controls.
- **OEMs and vendors:** No product manufacturers, OEMs, or commercial vendors are named.

### Description

Irmo Chapin Recreation Commission is seeking qualifications from architecture and/or engineering firms to design, engineer, and obtain permits for a multi-phase recreational vehicle campground. The initial phase includes approximately 30 full-hookup RV campsites, a bathhouse, entrance improvements, internal roadways, and associated infrastructure. The scope includes construction drawings, assessments, permitting and approvals coordination, cost estimates, bid documents, and construction oversight and administration. Proposals must address the ability to meet a two-year timeline associated with Land and Water Conservation Fund grant guidelines; the project is intended to be completed in phases.

[View original listing](https://scbo.sc.gov/online-edition?s=69926)
