# Utah Public Procurement Place U3P #DA27018

MTECH Provo Campus chiller replacement and mechanical system upgrades

**Posted:** November 12, 2026
**Respond By:** December 17, 2026
**Identifier:** DA27018
**NAICS:** 238220

Utah DFCM is seeking a mechanical contractor to replace the MTECH Provo Campus chiller system and upgrade associated equipment and controls.
- **Buyer and project:** State of Utah, Division of Facilities Construction and Management (DFCM); Mountainland Technical College (MTECH), Provo Campus. Construction budget: $550,000.
- **Main equipment:** Two 90-ton air-cooled chillers, replacing one existing 175-ton system. The drawings specify **Trane CGAM** chillers; project specifications identify Trane as the basis of design and allow approved equivalents such as **Carrier** or **Daikin**.
- **Associated equipment:** Four chilled-water pumps, a glycol feeder and propylene glycol, an expansion tank, three buffer tanks, a hydraulic separator, and a **Utah Yamas Controls** StruxureWare controller.
- **Work:** Remove the existing system; install and connect the new equipment; modify structural supports and electrical infrastructure; reconfigure hydronic piping; upgrade controls; and perform testing, balancing, commissioning, and owner training.
- **Notable technical requirements:** Chillers use R-454B refrigerant and a 30% propylene glycol loop, with BACnet controls and seismic requirements. Structural and seismic submittals require approval before mechanical work begins; controls must integrate with the existing Utah Yamas StruxureWare building system.
- **Site and hazardous-material context:** The building is occupied, utility interruptions require approval, and roof work must be performed by the roofing contractor responsible for the roof warranty. Supporting reports recommend proper removal and disposal of fluorescent lamps, PCB ballasts, equipment, chemicals, e-waste, and electronics; surveys reported no asbestos in sampled materials and no lead-based paint detected.
- **Other named companies:** WHW Engineering, ARW Engineers, R & R Environmental, Inc., and Eurofins Reservoirs Environmental, Inc. are identified in project or supporting documents; they are not identified as chiller manufacturers.

### Description

The State of Utah Division of Facilities Construction and Management (DFCM) is soliciting bids from Stage I-prequalified mechanical contractors for construction services at the MTECH Provo Campus. Work includes removing the existing 175-ton air-cooled chiller and installing two new 90-ton air-cooled chillers, with related structural, electrical, piping, glycol, and controls integration work. The construction cost estimate is $550,000. Bidders must attend the mandatory meeting and submit a bid bond; bids are due December 17, 2026.

[View original listing](https://utah.bonfirehub.com/opportunities/262422)