# SAM #SSN-2027-32995

A&E Design for EV Battery Fire Protection and Extraction at NLR

**Buyer:** Alliance for Sustainable Energy
**Posted:** November 12, 2026
**Respond By:** November 19, 2026
**Identifier:** SSN-2027-32995
**NAICS:** 541330

NLR is seeking engineering design services to improve fire response and burning-EV removal at its Energy Systems Integration Facility in Golden, Colorado.
- **Government buyer:** U.S. Department of Energy, Office of Critical Minerals and Energy Innovation; National Laboratory of the Rockies (NLR), Acquisition Services.
- **Services requested:** One A&E design engagement covering Title I, II, and III services for the Optimization & Controls Lab (OCL), including an Issued for Construction design package.
- **Design scope:** Automate the roof ventilation system and existing roll-up doors to open upon smoke detection, with emergency-power integration; design a manual system to move a burning EV from the lab bay through the doors to an adjacent outdoor lot.
  - The extraction design must address conveying equipment, operating layout, pull path, load capacity, bollards, and supporting components.
- **Requirements:** Meet 2021 International Fire Code Section 910 and West Metro Fire Protection District requirements; include operational testing and acceptance with NLR’s Fire Authority Having Jurisdiction and the local fire district.
- **OEMs and vendors:** No product manufacturers or commercial vendors are specified. Named organizations include NLR, the U.S. Department of Energy, and West Metro Fire Protection District.
- **Performance period:** Anticipated 12-month base period: 4 months for design and 8 months for construction support. No option years are stated.

### Description

<p>National Laboratory of the Rockies (NLR) is seeking an A&amp;E firm to provide Title I, II, and III design services for modifications to the existing Optimization &amp; Controls Lab (OCL) inside NLR&rsquo;s Energy Systems Integration Facility (ESIF) at our South Table Mountain Campus located in Golden, CO. The resulting IFC design package will have two (2) primary components:</p>

<ol>
	<li>Automate a roof ventilation system and the existing laboratory roll-up doors to open during a fire.</li>
	<li>Provide a manual extraction system capable of removing a burning Electric Vehicle (EV) from the OCL bay through the roll-up doors to the adjacent outdoor lot.</li>
</ol>

[View original listing](https://sam.gov/opp/f03ac55865c7436a9398b7445f22bccd/view)
