# Canyon School District Ionwave #27-00054CP-B Addendum 2

Phase I central warehouse cooler-freezer refrigeration upgrade

**Posted:** November 04, 2026
**Respond By:** November 20, 2026
**Identifier:** 27-00054CP-B Addendum 2
**NAICS:** 238220, 238210, 238290

Canyons School District is soliciting Phase I construction services to upgrade refrigeration at its central warehouse in Sandy, Utah.
- **Government buyer:** Canyons School District (CSD), including the Canyons School District Board of Education; no specific sub-agency or procurement office is identified.
- **Scope:** Demolition and replacement work for the warehouse cooler-freezer refrigeration systems, including equipment installation, refrigerant piping, electrical connections, controls, heat trace, testing, and commissioning. Phase II is excluded.
- **Named manufacturers and vendors:** **KRACK** is specified for refrigeration equipment, or approved equal. **Schneider Electric EcoStruxure** is identified as the district’s existing controls system; **UTAH YAMAS Controls, Inc. SLC.** is named as its supplier and installer. No awardee is identified.
- **Equipment and quantities:** Schedules and specifications vary across the documents: one KRACK condensing unit (HDSD-2200LDM-JH-D) and one KRACK evaporator (MSD34E-0602DVKK) are listed in the bid set; another specification describes two evaporators and two outdoor condensing units. Electrical schedules also list one CU-1, one E-1H evaporator heater, and one E-1M evaporator motor. Two TED134125 breakers are specified for new condensing units. See line items for document-specific quantities.
- **Notable requirements:** Refrigerant is R-454A; controls must integrate with the district system and use open BACnet or LON protocols and freely programmable controllers. Wireless devices are not accepted. Requirements include seismic restraints, leak detection, alarm integration, commissioning assistance, operator training, and equipment and controls warranties. Contractor licensing and commercial refrigeration experience are required; EPA 608 and applicable RETA certifications are preferred.
- **Other project costs and work:** The bid includes construction services, a construction contingency of $25,000 requiring written approval, and a performance and payment bond line. Electrical scope includes removal and return of two existing 100A breakers, new wiring and conduit, and heat-trace work.

### Description

Canyons School District is seeking competitive bids from qualified contractors for phase one commercial refrigeration services at its central warehouse. The work includes construction services, including demolition, materials, and labor, in accordance with the provided design documents for the warehouse cooler-freezer upgrade. The project is intended to be delivered in two budget-based phases; this solicitation is for Phase 1 only, with Phase 2 excluded. Bidders must be properly licensed in Utah, have at least five years of commercial refrigeration installation experience, and have completed similar work within the past six months.

[View original listing](https://canyonsdistrict.ionwave.net/PublicDetail.aspx?bidID=1694&SourceType=1)