# Santa Rosa County Opengov #26-058

Pond Creek Bank Stabilization and Optional Seawall Repairs at Mayo Park

**Posted:** September 21, 2026
**Respond By:** October 28, 2026
**Identifier:** 26-058
**NAICS:** 237990

Santa Rosa County is seeking bids for bank stabilization and optional seawall repairs at Mayo Park along Pond Creek.
- **Government buyer:** Santa Rosa County Board of County Commissioners, Public Works Department; Engineering and Procurement Office are also identified in the solicitation.
- **Estimated budget:** $440,000, with County and State funding.
- **Base bid:** Stabilize the east bank using excavation, woody material, stone and soil backfill, coir erosion-control materials, native plantings, and related construction work.
- **Bid Alternate A:** Improve the west bank and repair the storm-damaged seawall, including a steel sheet-pile wall system.
- **Plants:** 18 each of button bush, elderberry, silky dogwood, and Virginia willow, planted as live stakes 2 feet on center.
- **Notable requirements:** Follow project drawings and County and FDOT standards; obtain Engineer approval for woody materials; exclude invasive species. The drawing calls for driven logs with root balls and posts, woody debris, stone and soil lifts, live branches, live stakes, and coir erosion-control materials.
- **OEMs and branded products:** No OEMs or branded products are specified.
- **Vendors named as prospective bidders:** All Phase Construction of NW FL L.L.C.; BlueTerra LLC; Gulf Marine Construction, Inc.; MKM Quality Construction Inc.; and Sea & Shoreline, LLC.
- **Performance period:** Base work is 120 days from Notice to Proceed (90 days to substantial completion and 30 days to final completion); Alternate A adds 90 days if selected. No option years or annual subscription are indicated.

### Description

The project addresses storm-related erosion along Pond Creek within Mayo Park. Work includes excavation of unsuitable material and creek-bank stabilization using natural materials such as logs, limbs, stone, select fill, and native plantings. Bid Alternate A covers repairs to the storm-damaged seawall on the creek’s western shore. Work must meet County and FDOT standards; the base project allows 120 days from Notice to Proceed, with an additional 90 days for Alternate A.

[View original listing](https://procurement.opengov.com/portal/santarosafl/projects/299623)
