# University of Minnesota Ionwave #04-700-20-1443 Addendum 4

University of Minnesota Morris EcoCenter shelter, trellis, and site construction

**Posted:** September 30, 2026
**Respond By:** November 17, 2026
**Identifier:** 04-700-20-1443 Addendum 4
**NAICS:** 236220

The University of Minnesota’s Morris campus is seeking a fixed-price proposal to build an EcoCenter shelter and trellis project in Battle Lake, Minnesota.
- **Buyer and project team**
  - Buyer: Board of Regents of the University of Minnesota; project at University of Minnesota–Morris, EcoCenter.
  - Engan Associates PA is the Architect/Engineer of Record.
- **Shelter and trellis products — OEMs highlighted**
  - **Scenic Shelters, LLC** approved equal: one 30-by-25-foot steel open-gable shelter, model **SOG3025-CUS**, and two 12-by-55-foot custom curved steel pergolas, model **SPE1255-CUS**. These are material-only products; unloading and installation are by others.
  - Basis of design: **Poligon (PorterCorp)** Kokomo Amphitheater shelter and Poligon Concord Trellis. The shelter includes a standing-seam steel roof over prefinished tongue-and-groove Hem Fir decking. Drawings also specify ALMA-style columns.
- **Construction scope and other specified products**
  - Base work includes site work, shelter and trellis construction, concrete foundations and slab, and conduit for future electrical. Concrete specifications include reinforcing steel, cast-in-place concrete, masonry units, architectural cast stone, and aluminum railings.
  - Additional specified products include **VPR RET-4** under-slab vapor retarder; low-gloss and high-gloss curing/sealing compounds (CONC SLR-1 and CONC SLR-2); and **Greenstreak Hydrotite CJ-0725-3D** cold-joint waterstop, or approved equal. Acceptable curing/sealing product names include **W.R. Meadows**, **BASF**, and **Scofield**; cast stone basis manufacturer is **American Artstone Company**.
- **Services and pricing**
  - Submit a fixed lump-sum proposal for construction. Include pricing for Alternate A-1, non-frost-susceptible structural fill, and Unit Price UP-1, additional engineering fill per cubic yard.
  - Construction budget is **$360,000**. Quantities for specification-section materials beyond the shelter and pergolas are not stated.
- **Notable project requirements**
  - Prevailing wages applicable to Otter Tail County apply. The contractor must provide temporary power by generator or batteries because owner power is unavailable.
  - The general contractor must obtain the building permit, and excavation requires a separate excavation permit. Shelter structural-frame and factory-finish warranties are each 10 years.
  - The project is tax-exempt for charges to the University, but the exemption is not transferable; the contractor remains responsible for taxes on third-party purchases.

### Description

The University of Minnesota is requesting proposals for construction services for a pre-engineered shelter on the Morris campus. The selected respondent will perform the work for a fixed lump sum; the stated total construction budget is $360,000. The work includes a pre-engineered shelter project, with project details and requirements provided in the RFP documents, specifications, and drawings. The project must be substantially complete by September 30, 2027, and responses are due November 17, 2026, at 2:00 PM CT.

[View original listing](https://mbid.ionwave.net/PublicDetail.aspx?bidID=7610&SourceType=1)
