# Nevada Ionwave #919-HE

NSU campus infrastructure inventory, analysis, mapping, and Infrastructure Atlas consulting services

**Posted:** November 09, 2026
**Respond By:** January 12, 2027
**Identifier:** 919-HE
**NAICS:** 541370, 541340

Nevada State University is seeking consulting support to document and assess campus infrastructure and create an Infrastructure Atlas for its Henderson campus.
- **Buyer:** Board of Regents of the Nevada System of Higher Education, on behalf of Nevada State University (NSU); the RFQ identifies NSHE, NSU, and Business Center South.
- **Scope:** Review records; inventory, verify, and map utilities and other infrastructure; analyze utility capacity and constraints; conduct campus, topographic, and survey-control mapping; inventory parking; and develop coordinated CAD and GIS materials for the approximately 512-acre campus.
- **Deliverables:** A draft for NSU review and a final Atlas, including ten bound copies, a searchable bookmarked PDF, editable AutoCAD files, a GIS geodatabase and metadata, survey and mapping files, utility and parking maps/data, and supporting digital materials.
- **Notable requirements:** Document verification levels and data gaps; provide georeferenced, usable source files. Intrusive subsurface investigations, new boundary surveys, optional environmental due diligence, and building-interior verification are outside the base scope unless separately authorized.
- **Additional attachment services:** A professional design-services agreement describes phased work, MWDBE goals and reporting, and insurance and indemnification requirements. A separate ULI Nevada technical assistance panel covers resilient campus expansion, development strategies, infrastructure and water security, and community integration; it is not identified as part of the RFQ’s base scope.
- **Named organizations:** The buyer is NSHE/NSU. ULI Nevada is named in the technical assistance material. TSK Architects, Design Workshop, and Comprehensive Facilities Planning, Inc. are credited for prior campus planning, not identified as proposers. The design agreement’s consultant name is redacted. No product manufacturers or OEMs are specified.

### Description

Nevada State University seeks a qualified professional consulting firm to develop a comprehensive Infrastructure Inventory and Atlas for its approximately 512-acre Henderson campus. The work includes reviewing existing records, inventorying and mapping campus utilities and site infrastructure, evaluating utility capacities and constraints, conducting land and topographic surveys, and preparing coordinated CAD/GIS mapping. The final Atlas must be provided in printed, searchable PDF, and editable digital formats to support campus development, capital projects, operations, and deferred maintenance planning. Statements of Qualifications must be submitted through Nevada Government eMarketplace (NGEM) by January 12, 2027, at 3:00 PM PST.

[View original listing](https://nevada.ionwave.net/PublicDetail.aspx?bidID=20810&SourceType=1)
