# SAM #W911KB27RWP01

Design-build construction of the ACC003 Weapons Generation Complex and Northern Flightline at JBER

**Buyer:** W2SN ENDIST Alaska
**Posted:** November 11, 2026
**Respond By:** November 24, 2026
**Identifier:** W911KB27RWP01
**NAICS:** 236220, 236210

USACE Alaska District is seeking a design-build team for a major facilities project at Joint Base Elmendorf-Richardson (JBER), Alaska.
- **Government buyer:** U.S. Army Corps of Engineers (USACE), Alaska District.
- **Project:** ACC003 Weapons Generation Complex and Northern Flightline, part of the Fighter Town Recapitalization Program.
- **Requested work:** Design-build construction of approximately 16 new facilities, including hangars, operations buildings, and munitions storage magazines.
- **Key operational requirement:** The new Weapons Generation Complex must be operational before the existing facility is decommissioned, avoiding mission downtime.
- **Site conditions:** Construction sites will be pre-excavated; utilities will be provided through a separate agreement.
- **OEMs and vendors:** None identified. No product quantities or part numbers are specified.

### Description

The U.S. Army Corps of Engineers USACE, Alaska District, is seeking to identify a Design-Build Team or Design-Builder for ACC003 Weapons Generation Complex and Northern Flightline, a major project in support of the Fighter Town Recapitalization FTR Program at Joint Base Elmendorf-Richardson JBER, Alaska. The FTR Program is a multiphase initiative to redevelop a significant portion of JBER with modern, resilient, and expanded infrastructure while maintaining mission continuity for active base and airfield operations throughout all phases of construction and facility turnover. Within this broader program, the ACC003 project will encompass construction of the new Weapons Generation Complex and associated Northern Flightline facilities at JBER, Alaska. The scope includes approximately sixteen new facilities, comprising hangars, operations buildings, and munitions storage magazines. A key constraint is the requirement for the new WGC to be operational before the existing facility can be decommissioned, ensuring zero operational downtime for this mission. The project will be constructed on pre-excavated sites with preconstructed utilities delivered under a separate, preceding agreement. <br/><br/><br/><strong>Additional Links:</strong><br/><a href='https://toolbox-piee.eb.mil/' target='_blank'>Department of Defense Procurement Toolbox</a><br/><a href='https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911KB27RWP01&noticeType=SolicitationNotice' target='_blank'>PIEE Solicitation Module Link for W911KB27RWP01</a><br/><a href='https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf' target='_blank'>Registration Instructions for the PIEE Solicitation Module</a><br/><a href='https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml' target='_blank'>Web Based Training for the PIEE Solicitation Module</a>

[View original listing](https://sam.gov/opp/5cea338de5d14ff69abd79d2e3d4e4c5/view)
