Sources Sought: Ford Island Roll-Up Door Installation and Facility Modifications

**Buyer:** Naval Undersea Warfare Center (NUWC)
**Posted:** November 10, 2026
**Respond By:** December 01, 2026
**Identifier:** Ford_Island_Hawaii_Roll_Up_Door
**NAICS:** 238290, 238210, 238220, 238310, 238350, 236220

The Department of the Navy is researching construction capabilities for a roll-up door project at Ford Island, Hawaii.
- **Government buyer:** Department of the Navy, Naval Sea Systems Command (NAVSEA), Naval Undersea Warfare Center Division (NUWC), Keyport.
- **Opportunity:** Sources sought / market research only; this is not a solicitation or request for proposals. The final scope and acquisition approach are undetermined.
- **Requested product:** One large roll-up door, to be furnished and installed in an existing non-load-bearing concrete masonry unit (CMU) wall. No manufacturer, model, part number, or quantity specification is provided beyond the single anticipated door.
- **Anticipated construction services:** Prepare the wall opening through demolition, cutting, removal, framing, and finishing; relocate or modify electrical, compressed-air, and water utilities; relocate an existing air-conditioning unit and ductwork; and restore affected interior and exterior finishes.
- **Notable requirements:** Work must be coordinated in an operational facility and account for access, safety, environmental, and utility-outage constraints. Respondents are asked to describe relevant trade capabilities, Hawaii and military-installation experience, logistics, and CMMC Level 1 status.
- **OEMs and vendors:** No OEMs, manufacturers, or vendors are named.

### Description

<p>THIS IS NOT A SOLICITATION.&nbsp; THIS IS A REQUEST FOR INFORMATION ONLY.&nbsp; SEE ATTACHMENTS FOR FULL DETAILS.</p>

<p>The anticipated project includes, but is not limited to:</p>

<p>&bull; Furnishing and installing a large roll-up door within an existing non-load-bearing concrete masonry unit (CMU) wall.</p>

<p>&bull; Demolition, cutting, removal, framing, finishing, and related work necessary to create the new door opening.</p>

<p>&bull; Relocation and/or modification of affected utilities, including electrical power, compressed air, and water lines.</p>

<p>&bull; Relocation of an existing air-conditioning unit and associated ductwork to accommodate installation and operation of new equipment.</p>

<p>&bull; Restoration of affected interior and exterior finishes.</p>

<p>&bull; Coordination of work in an operational facility and compliance with installation access, safety, environmental, and utility-outage requirements.</p>

<p>See the attached questionnaire for full details available at this time.</p>