# South Carolina Business Opportunities #65537

Replace Air-Cooled Chiller Piping and Electrical Connections at Aiken Convocation

**Posted:** May 04, 2026
**Respond By:** May 28, 2026
**Identifier:** 65537
**NAICS:** 238220, 238210

The University of South Carolina is seeking a contractor to replace chiller piping and electrical connections at its Aiken Convocation facility.
- **Buyer:** University of South Carolina; facility: Aiken Convocation, Graniteville, South Carolina.
- **Requested work:** Design-Bid-Build replacement of existing air-cooled chiller piping and electrical connections, including labor and materials, demolition and disposal, and controls work per project drawings.
- **OEMs and vendors:** No OEMs or vendors are identified in the notice.
- **Estimated construction cost:** $580,000–$670,000.

### Description

The project is to replace existing air-cooled chiller piping and electrical connections as defined in the drawing. Work includes labor and materials for demolition, disposal, and controls. The delivery method is Design-Bid-Build, and bids must be submitted by hand delivery or mail service only. The stated construction cost range is $580,000 to $670,000.

[View original listing](https://scbo.sc.gov/online-edition?s=65537)
