# Contra Costa Community College Planetbids #148103

Replace the Automotive Technology paint booth and complete related campus improvements

**Posted:** November 06, 2026
**Respond By:** December 08, 2026
**Identifier:** 148103
**NAICS:** 236220, 238210, 238220, 238910

Contra Costa Community College District is seeking a contractor to replace the Automotive Technology building’s paint booth and complete related campus improvements.
- **Government buyer:** Contra Costa Community College District, Purchasing; California Division of the State Architect (DSA) documents identify structural testing and special-inspection requirements.
- **Named OEMs and vendors:** **Garmat** paint booth; **Pyro-Chem** Monarch dry-chemical fire-suppression system; **JUST** lavatory and associated fixtures.
- **Requested products:** One complete, operational Garmat spray paint booth; booth makeup-air and exhaust ductwork; a Pyro-Chem Monarch ABC fire-suppression system; and a JUST wall-mounted lavatory (A544912-T-J) with JUST JS-47-TGSA faucet, J15FS drain, and JTS-150 P-trap.
- **Construction and services:** Remove and dispose of the existing booth; perform related demolition, civil, architectural, structural, mechanical, plumbing, electrical, and site-improvement work, including testing, commissioning, and required structural inspections.
- **Notable requirements:** The project includes accessible-route and restroom improvements. Work will occur on an occupied campus, requiring student-safety precautions and secured staging. Bidders must hold an A or B construction license, attend a mandatory site visit, and include overtime and holiday work in their pricing. The project is subject to a Project Stabilization Agreement; no bid alternate is identified.
- **Estimated value:** $1,000,000.

### Description

The project requires removal and disposal of the existing paint booth and furnishing and installation of a new Garmat Paint Booth, complete and operational. Work includes selective demolition; civil, architectural, structural, mechanical, plumbing, and electrical work; site improvements; and associated labor, materials, equipment, testing, and commissioning, as detailed in DSA Approved Drawings No. 01-122115. The project is subject to a Project Stabilization Agreement. A mandatory pre-bid meeting is scheduled for November 18, 2026.

[View original listing](https://vendors.planetbids.com/portal/67229/bo/bo-detail/148103)
